Heuristics for hybrid flow shops with controllable processing times and assignable due dates

被引:80
作者
Gupta, JND [1 ]
Krüger, K
Lauff, V
Werner, F
Sotskov, YN
机构
[1] Ball State Univ, Dept Management, Muncie, IN 47306 USA
[2] Univ Magdeburg, Fak Math, D-39016 Magdeburg, Germany
[3] Inst Engn Cybernet, Minsk 220012, BELARUS
关键词
D O I
10.1016/S0305-0548(01)00040-5
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers a generalization of the permutation flow shop problem that combines the scheduling function with the planning stage. In this problem. each work center consists of parallel identical machines. Each job has a different release date and consists of ordered operations that have to be processed on machines from different machine centers in the same order. In addition, the processing times of the operations on some machines may vary between a minimum and a maximum value depending on the use of a continuously divisible resource. We consider a nonregular optimization criterion based on due dates which are not a priori given but can be fixed by a decision-maker. A due date assignment cost is included into the objective function. For this type of problems, we generalize well-known approaches for the heuristic solution of classical problems and propose constructive algorithms based on job insertion techniques and iterative algorithms based on local search. For the latter, we deal with the design of appropriate neighborhoods to find better quality solution. Computational results for problems with up to 20 jobs and 10 machine centers are given.
引用
收藏
页码:1417 / 1439
页数:23
相关论文
共 16 条
[1]  
ALIDAEE B, 1996, J PRODUCTION OPERATI, V5, P391
[2]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[3]   BRANCH AND BOUND ALGORITHM FOR THE FLOW-SHOP WITH MULTIPLE PROCESSORS [J].
BRAH, SA ;
HUNSUCKER, JL .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :88-99
[4]  
Chen B, 1998, Handbook of combinatorial optimization, P1493, DOI [DOI 10.1007/978-1-4613-0303-9_25, 10.1007/978-1-4613-0303-9_25]
[5]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166
[6]   ANALYTICAL DETERMINATION OF OPTIMAL TWK DUE-DATES IN A JOB SHOP [J].
CHENG, TCE .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 1985, 16 (06) :777-787
[7]  
GUPTA JND, 1979, DISAGGREGATION PROBL, P363, DOI [DOI 10.1007/978-94-015-7636-9_23, 10.1007/978-94-015-7636-9_23]
[8]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&
[9]   GENERAL FLOWSHOP SCHEDULING WITH RESOURCE CONSTRAINTS [J].
JANIAK, A .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1988, 26 (06) :1089-1103
[10]   Genetic algorithm for the permutation flow-shop scheduling problem with linear models of operations [J].
Janiak, A ;
Portmann, MC .
ANNALS OF OPERATIONS RESEARCH, 1998, 83 (0) :95-114