The stochastic time-cost tradeoff problem: A robust optimization approach

被引:49
作者
Cohen, Izack [1 ]
Golany, Boaz [1 ]
Shtub, Avraham [1 ]
机构
[1] Technion Israel Inst Technol, Fac Ind Engn & Management, IL-32000 Haifa, Israel
关键词
project management; time-cost tradeoff; robust optimization; linear programming;
D O I
10.1002/net.20153
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
We consider the problem of allocating resources to projects performed under given due dates and stochastic time-cost tradeoff settings. In particular, we show how to implement a state-of-the-art methodology known as "robust optimization" to solve the problem. In contrast to conventional approaches, the model we develop results in management policies rather than optimal values for the original decision variables. Hence, the project manager can postpone decisions to the point of time when they are actually required and then make them according to the optimal policy (which employs cumulative data on the project progress). The solutions are guaranteed to be robust-that is, ensuring feasibility except when the uncertain parameters assume extreme values. Still, as we demonstrate through an extensive numerical example, the price we need to pay to obtain that robustness is relatively small even for high uncertainty levels. (c) 2006 Wiley Periodicals, Inc.
引用
收藏
页码:175 / 188
页数:14
相关论文
共 23 条
[1]  
[Anonymous], MATH PROGRAMMING FIN
[2]   Cost/time trade-off analysis for the critical path method: A derivation of the network flow approach [J].
Baker, BM .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (12) :1241-1244
[3]   Robust solutions of Linear Programming problems contaminated with uncertain data [J].
Ben-Tal, A ;
Nemirovski, A .
MATHEMATICAL PROGRAMMING, 2000, 88 (03) :411-424
[4]   Retailer-supplier flexible commitments contracts: A robust optimization approach [J].
Ben-Tal, Aharon ;
Golany, Boaz ;
Nemirovski, Arkadi ;
Vial, Jean-Philippe .
Manufacturing and Service Operations Management, 2005, 7 (03) :248-271
[5]   Adjustable robust solutions of uncertain linear programs [J].
Ben-Tal, A ;
Goryashko, A ;
Guslitzer, E ;
Nemirovski, A .
MATHEMATICAL PROGRAMMING, 2004, 99 (02) :351-376
[6]   Robust truss topology design via semidefinite programming [J].
Ben-Tal, A ;
Nemirovski, A .
SIAM JOURNAL ON OPTIMIZATION, 1997, 7 (04) :991-1016
[7]   Robust optimization - methodology and applications [J].
Ben-Tal, A ;
Nemirovski, A .
MATHEMATICAL PROGRAMMING, 2002, 92 (03) :453-480
[8]   Free material design via semidefinite programming: The multiload case with contact conditions [J].
Ben-Tal, A ;
Kocvara, M ;
Nemirovski, A ;
Zowe, J .
SIAM JOURNAL ON OPTIMIZATION, 1999, 9 (04) :813-832
[9]  
Bertsimas D, 2004, LECT NOTES COMPUT SC, V3064, P86
[10]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41