Cost/time trade-off analysis for the critical path method: A derivation of the network flow approach

被引:10
作者
Baker, BM
机构
[1] School of MIS, Coventry University, Priory Street, Coventry
关键词
CPM; networks and graphs; project management;
D O I
10.1057/palgrave.jors.2600489
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A well-known problem in critical path analysis involves normal and crash durations being provided for each activity, with. corresponding costs, and requires a minimum cost schedule of durations to be determined for all possible durations of the project. It has long been known that an optimal solution to the problem can be obtained iteratively by constructing a minimum cost network flow problem and adjusting the durations of activities corresponding to a minimum capacity cut-set. A recent paper described this method, but gave no indication of how the method could be derived. It is shown here that a linear programming formulation and its dual enables this to be done very simply.
引用
收藏
页码:1241 / 1244
页数:4
相关论文
共 5 条
[1]  
BUSACKER RG, 1971, FINITE GRAPHS NETWOR
[2]  
Dantzig G. B., 1963, LINEAR PROGRAMMING E
[3]  
FLETCHER A, 1964, MANAGEMENT MATH PRAC
[4]   CRITICAL-PATH PLANNING AND SCHEDULING - MATHEMATICAL BASIS [J].
KELLEY, JE .
OPERATIONS RESEARCH, 1961, 9 (03) :296-320
[5]   Project management duration resource tradeoff analysis: An application of the cut search approach [J].
Phillips, S .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (05) :697-701