The management of mechanical integrity inspections at small-sized "Seveso" facilities

被引:16
作者
Bragatto, Paolo A. [1 ]
Pittiglio, Paolo [1 ]
Ansaldi, Silvia [1 ]
机构
[1] ISPESL, Italian Natl Inst Occupat Safety & Prevent, I-00040 Monte Porzio Catone, Roma, Italy
关键词
Mechanical integrity; Safety management system; Risk-based inspection; Major accident hazard; LIFE MANAGEMENT; SYSTEM;
D O I
10.1016/j.ress.2008.04.005
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The mechanical integrity (MI) of equipment has been controlled at all industrial facilities for many decades. Control methods and intervals are regulated by laws or codes and best practices. In European countries, the legislations implementing the Seveso Directives on the control of major accident hazards require the owner of establishments where hazardous chemicals are handled, to implement a safety management system (SMS). MI controls should be an integral part of the SMS. At large establishments this goal is achieved by adopting the RBI method, but in small-sized establishments with a limited budget and scanty personnel. a heuristic approach is more suitable. This paper demonstrates the feasibility and advantages of integrating SMS and MI by means of a simple method that includes a few basic concepts of RBI without additional costs for operator. This method, supported by a software tool, is resilient as it functions effectively in spite of eventual budget reductions and personnel turnover. The results of MI controls can also be exploited to monitor equipment condition and demonstrate the adequacy of technical systems to the Competent Authorities (CA). Furthermore, the SMS can "Capture" knowledge resulting from MI experience and exploit it for a better understanding of risk. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:412 / 417
页数:6
相关论文
共 24 条
[1]  
Ablitt C, 2005, 3 MENDT MIDDL E NOND
[2]  
*AICHE, 1994, DOWS FIR EXPL IND HA, P1097
[3]   Risk based maintenance optimization: foundational issues [J].
Apeland, S ;
Aven, T .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2000, 67 (03) :285-292
[4]  
*API, 2003, 580 API
[5]  
ASME, 1991, RISK BAS INSP DEV GU
[6]   RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn [J].
Bareiss, J ;
Buck, P ;
Matschecko, B ;
Jovanovic, A ;
Balos, D ;
Perunicic, M .
INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2004, 81 (10-11) :807-813
[7]   Reviewing the safety management system by incident investigation and performance indicators [J].
Basso, B ;
Carpegna, C ;
Dibitonto, C ;
Gaido, G ;
Robotto, A ;
Zonato, C .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2004, 17 (03) :225-231
[8]  
BINETTI R, 1990, PREVENZIONE OGGI, V1
[9]  
BRAGATOO P, 2007, P ESREL C 2007 STAV
[10]   A methodology for risk-based inspection of pressurized systems [J].
Hagemeijer, PM ;
Kerkveld, G .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART E-JOURNAL OF PROCESS MECHANICAL ENGINEERING, 1998, 212 (E1) :37-47