Simple priority rule combinations: an approach to improve both flow time and tardiness

被引:37
作者
Barman, S
机构
[1] Division of Management, College of Business Administration, University of Oklahoma, Norman, OK
关键词
D O I
10.1080/002075497194480
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Prior research indicates that no single priority rule displays superior performance on both flow time and tardiness measures. While the 'shortest processing time' rule does minimize the mean flow time, it performs poorly on the tardiness criterion. This study focuses on the same issue, whether both tardiness and flow time measures can be improved at the same time by combining simple priority rules. A total of 64 combination rules were developed by concurrently deploying four simple priority rules in all possible combinations in a simulated, three-stage serial manufacturing shop. The performance of the combinations was analysed and compared using three criteria, the mean flow time, mean tardiness, and the percentage of tardy jobs, under two shop load conditions. The results indicate that combinations using the 'shortest processing time' and 'earliest due date' rules produce excellent results on both tardiness and percentage of tardy jobs criteria without substantially sacrificing flow time. In addition, the shop load factor appears to have little effect upon the performance of these combinations.
引用
收藏
页码:2857 / 2870
页数:14
相关论文
共 26 条
[1]   2 NEW RULES TO MINIMIZE TARDINESS IN A JOB SHOP [J].
ANDERSON, EJ ;
NYIRENDA, JC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (12) :2277-2292
[2]  
[Anonymous], AIIE T
[3]  
[Anonymous], 1979, PRODUCTION INVENTORY
[4]  
BAKER KR, 1984, INT J PROD RES, V22, P917, DOI 10.1080/00207548408942511
[5]  
BAKER KR, 1982, J OPER MANAG, V3, P37, DOI DOI 10.1016/0272-6963(82)90020-1
[6]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[7]   A SLAM-II SIMULATION STUDY OF A SIMPLIFIED FLOWSHOP [J].
BARRETT, RT ;
BARMAN, S .
SIMULATION, 1986, 47 (05) :181-189
[8]  
BAWRMAN S, 1988, P DEC SCI I ANN M NO
[9]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[10]   SCHEDULING A SINGLE-MACHINE TO MINIMIZE 2 CRITERIA - MAXIMUM TARDINESS AND NUMBER OF TARDY JOBS [J].
CHEN, CL ;
BULFIN, RL .
IIE TRANSACTIONS, 1994, 26 (05) :76-84