A stochastic inventory model with lead time and lot size interaction

被引:24
作者
Hariga, MA [1 ]
机构
[1] King Saud Univ, Coll Engn, Riyadh 11421, Saudi Arabia
关键词
inventory; lot size; lead time;
D O I
10.1080/095372899232957
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Most deterministic and stochastic inventory models assume that the lead time is a given parameter, and determine the optimal operating policy on the basis of this unrealistic assumption. In this paper, we incorporate a common inter-relationship between lot size and lead time in the stochastic continuous review inventory control (Q, r) model. We present an efficient iterative procedure that determines the optimal or near-optimal lot size and reorder point that minimize the total annual inventory cost for the extended (Q, r) model. We Further propose another analytical procedure that generates the lot size and safety stock simultaneously. We also show that our model will result in smaller production lot size and shorter lead time than an earlier model reported in the literature.
引用
收藏
页码:434 / 438
页数:5
相关论文
共 8 条
[1]  
BENDAYA M, 1994, J OPER RES SOC, V45, P579, DOI 10.2307/2584393
[2]  
HADLEY G, 1966, ANAL INVENTORY SYSTE
[3]   Some stochastic inventory models with deterministic variable lead time [J].
Hariga, M ;
Ben-Daya, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 113 (01) :42-51
[4]  
Johnson L.A., 1974, OPERATIONS RES PRODU
[5]   LOT SIZES, LEAD TIMES AND IN-PROCESS INVENTORIES [J].
KARMARKAR, US .
MANAGEMENT SCIENCE, 1987, 33 (03) :409-418
[6]   LOT-SIZE DEPENDENT LEAD TIMES IN A Q,R INVENTORY SYSTEM [J].
KIM, JS ;
BENTON, WC .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (01) :41-58
[7]  
Schonberger R.J., 1982, JAPANESE MANUFACTURI
[8]  
[No title captured]