Concurrent process planning and scheduling in distributed virtual manufacturing

被引:52
作者
Wu, SH [1 ]
Fuh, JYH [1 ]
Nee, AYC [1 ]
机构
[1] Natl Univ Singapore, Dept Mech Engn, Singapore 119260, Singapore
关键词
D O I
10.1080/07408170208928851
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the fast development of the world economy, distributed virtual manufacturing is becoming increasingly important since it can respond rapidly to market changes and make resource sharing more efficient among manufacturing partners. In this environment., partners may be located at different geographical locations. and co-operation among partners is a vital task and thus concurrent planning and scheduling has become a challenging research topic. This paper presents a computerized model that can integrate these manufacturing functions and resolve some of the critical problems in distributed virtual manufacturing, such as virtual cooperation, optimal partner selection. etc. This integration model is realized through a multi-agent approach that provides a practical approach for software integration in a distributed environment. A cost function is proposed and adopted for optimal partner selection in a virtual enterprise. which not only considers a partner's manufacturing capability and process requirements, but also the processing time, partner's location and product due date. Through establishing a virtual manufacturing model in a simulated environment, the proposal was validated with a case study. It shows that the proposed methodology can satisfy the distribution and agility requirements. This approach is able to contribute to the reduction of product cost, improving product quality and shortening lead time, compared to the sequential approach in the normal engineering and production practice.
引用
收藏
页码:77 / 89
页数:13
相关论文
共 17 条
[1]  
El Maraghy H. A., 1992, P 24 CIRP INT SEM MA, P1
[2]  
Huang H., 1993, P 1993 NSF DES MAN S, V2, P1373
[3]   A PROGRESSIVE APPROACH FOR THE INTEGRATION OF PROCESS PLANNING AND SCHEDULING [J].
HUANG, SH ;
ZHANG, HC ;
SMITH, ML .
IIE TRANSACTIONS, 1995, 27 (04) :456-464
[4]  
IWATA K, 1997, ANN CIRP, V46, P335
[5]  
LEE KI, 1997, ANN CIRP, V46, P347
[6]  
Lee KJ, 1998, J MICROBIOL BIOTECHN, V8, P1
[7]   MODIFICATION OF CAPP SYSTEMS FOR CAPP SCHEDULING INTEGRATION [J].
LIAO, TW ;
COATES, ER ;
AGHAZADEH, F ;
MANN, L ;
GUHA, N .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 26 (03) :451-463
[8]  
Mallur S., 1992, P MAN INT, P335
[9]   On-line integration of a process planning module with production scheduling [J].
Mamalis, AG ;
Malagardis, I ;
Kambouris, K .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 1996, 12 (05) :330-338
[10]  
ONOSATO M, 1993, ANN CIRP, V42, P415