Production control in semi-automated systems: Comparison between constant and stochastic speeds

被引:2
作者
Friedman, L
GolenkoGinzburg, D
SinuanyStern, Z
机构
[1] Department of Industrial Engineering and Management, Ben-Gurion University of the Negev, Beer-Sheva
关键词
assembly line; chance constraint; production control; stochastic process;
D O I
10.1080/09537289608930339
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper deals with a production system which includes a deterministic assembly line and a supplementary production unit processing, with random disturbances, parts for the line. The decision-maker must determine both the speed to be introduced at each control point and the timing of the next control point, given the actual accumulated production observed al the control point: the deterministic rate of demand of the assembly line and a specified probability that there will be no on-line shortage of parts. This problem does not yet have an optimal solution; however, a subproblem can be formulated in which the speed is given and only the next control point has to be determined. Analytical optimal solutions were found for this subproblem under true extreme assumptions: (1) speed is a random variable that changes at the routine control point and remains constant until the next control point; (2) speed behaves like a Brownian motion, i.e. it changes continuously between two adjacent control points. This paper focuses on the comparison between the solution of the constant and the stochastic assumption for the normal distribution. Practical applications arising from this comparison are also given.
引用
收藏
页码:176 / 183
页数:8
相关论文
共 14 条
[1]   PERFORMANCE EVALUATION OF FLEXIBLE MANUFACTURING SYSTEMS [J].
ARBEL, A ;
SEIDMANN, A .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS, 1984, 14 (04) :606-617
[2]   A MATHEMATICAL-PROGRAMMING APPROACH TO A DETERMINISTIC KANBAN SYSTEM [J].
BITRAN, GR ;
LI, C .
MANAGEMENT SCIENCE, 1987, 33 (04) :427-441
[3]   OPTIMAL OPERATING RULES FOR AUTOMATED MANUFACTURING SYSTEMS [J].
BUZACOTT, JA .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1982, 27 (01) :80-86
[4]   DETERMINING CONTROL POINTS OF A PRODUCTION SYSTEM UNDER A CHANCE CONSTRAINT [J].
FRIEDMAN, L ;
GOLENKOGINZBURG, D ;
SINUANYSTERN, Z .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 18 (02) :139-144
[5]  
FRIEDMAN L, 1993, J OPERATIONAL RES SO, V442, P161
[6]   FEEDING PARTS WITH RANDOM PRODUCTION SPEED TO AN ASSEMBLY LINE [J].
GOLENKOGINZBURG, D ;
SINUANYSTERN, Z ;
FRIEDMAN, L .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 16 (02) :91-96
[7]   PRODUCTION CONTROL WITH VARIABLE SPEEDS AND INSPECTION POINTS [J].
GOLENKOGINZBURG, DI ;
SINUANYSTERN, Z .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :629-636
[8]  
Heyman D.P., 1984, STOCHASTIC MODELS OP, VII.
[9]  
LINN RJ, 1987, INFOR, V25, P66
[10]   A MODELING FRAMEWORK FOR PLANNING AND CONTROL OF PRODUCTION IN DISCRETE PARTS MANUFACTURING AND ASSEMBLY SYSTEMS [J].
MAXWELL, W ;
MUCKSTADT, JA ;
THOMAS, LJ ;
VANDEREECKEN, J .
INTERFACES, 1983, 13 (06) :92-104