摘要
A dynamic Bayesian network (DBN) model for probabilistic assessment of tunnel construction performance is introduced. It facilitates the quantification of uncertainties in the construction process and of the risk from extraordinary events that cause severe delays and damages. Stochastic dependencies resulting from the influence of human factors and other external factors are addressed in the model. An efficient algorithm for evaluating the DBN model is presented, which is a modification of the so-called Frontier algorithm. The proposed model and algorithm are applied to an illustrative case study, the excavation of a road tunnel by means of the New Austrian Tunneling Method.
引用
收藏
页码:1 / 21
页数:21
相关论文
共 40 条
[1]  
Aldorf J., 2010, TUNEL, V19, P83
[2]  
[Anonymous], 2007, Bayesian networks and decision graphs, DOI DOI 10.1007/978-0-387-68282-2
[3]  
[Anonymous], P ITA SPONS CHIN INT
[4]  
Bartak J., 2007, MONOGRAPH SATRA
[5]   Modelling TBM performance with artificial neural networks [J].
Benardos, AG ;
Kaliampakos, DC .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2004, 19 (06) :597-605
[6]  
Chan M. H. C., 1981, THESIS MIT CAMBRIDGE
[7]   Calculation of Posterior Probabilities for Bayesian Model Class Assessment and Averaging from Posterior Samples Based on Dynamic System Data [J].
Cheung, Sai Hung ;
Beck, James L. .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2010, 25 (05) :304-321
[8]   Bayesian updating application into simulation in the North Edmonton Sanitary Trunk tunnel project [J].
Chung, Tae Hwan ;
Mohamed, Yasser ;
AbouRizk, Simaan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2006, 132 (08) :882-894
[9]   Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No.2 [J].
Eskesen, SD ;
Tengborg, P ;
Kampmann, J ;
Veicherts, TH .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2004, 19 (03) :217-237
[10]   Risk assessment of decommissioning options using Bayesian networks [J].
Faber, MH ;
Kroon, IB ;
Kragh, E ;
Bayly, D ;
Decosemaeker, P .
JOURNAL OF OFFSHORE MECHANICS AND ARCTIC ENGINEERING-TRANSACTIONS OF THE ASME, 2002, 124 (04) :231-238