Scheduling with subcontracting options

被引:68
作者
Chen, Zhi-Long [1 ]
Li, Chung-Lun [2 ]
机构
[1] Univ Maryland, Dept Decis Operat & Informat Technol, Robert H Smith Sch Business, College Pk, MD 20742 USA
[2] Hong Kong Polytech Univ, Fac Business, Dept Logist, Kowloon, Hong Kong, Peoples R China
基金
美国国家科学基金会;
关键词
Scheduling; subcontracting; computational complexity; worst-case analysis; asymptotic analysis;
D O I
10.1080/07408170801975057
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Motivated by a problem commonly faced by time-sensitive product manufacturers, an analytical model to study the joint decisions of subcontracting and detailed job scheduling is proposed. In the proposed model, a manufacturer operates in a make-to-order fashion and receives a set of orders from its customers at the beginning of the planning horizon. The orders can be either processed by the manufacturer in-house or subcontracted to one of several available subcontractors, possibly at a higher cost. The manufacturer needs to determine which orders should be produced in-house and which orders should be subcontracted. Furthermore, it needs to determine a production schedule for the orders to be produced in-house. The objective is to minimize the total production and subcontracting cost, subject to a constraint on the maximum completion time of the orders. We analyze the computational complexity of the model, develop a heuristic for solving it and analyze worst-case and asymptotic performances of the heuristic. We also study the value of subcontracting by comparing our model and a model where no subcontracting option is available to the manufacturer. Computational results demonstrate that the subcontracting option gives the manufacturer a significant performance improvement. Related managerial insights are also provided.
引用
收藏
页码:1171 / 1184
页数:14
相关论文
共 29 条
[1]   Tactical capacity management under capacity flexibility [J].
Alp, Osman ;
Tan, Tarkan .
IIE TRANSACTIONS, 2008, 40 (03) :221-237
[2]   Capacity acquisition, subcontracting, and lot sizing [J].
Atamtürk, A ;
Hochbaum, DS .
MANAGEMENT SCIENCE, 2001, 47 (08) :1081-1100
[3]  
BAZINET CG, 1998, BESTS REV, V99, P85
[4]   A study of simple rules for subcontracting in make-to-order manufacturing [J].
Bertrand, JWM ;
Sridharan, V .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 128 (03) :509-531
[5]   A Brownian approximation of a production-inventory system with a manufacturer that subcontracts [J].
Bradley, JR .
OPERATIONS RESEARCH, 2004, 52 (05) :765-784
[6]   Decentralization cost in scheduling: A game-theoretic approach [J].
Bukchin, Yossi ;
Hanany, Eran .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2007, 9 (03) :263-275
[7]   A new approach to job shop scheduling problems with due date constraints considering operation subcontracts [J].
Chung, DY ;
Lee, K ;
Shin, K ;
Park, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 98 (02) :238-250
[8]  
Craumer M, 2002, HARVARD MANAGEME MAY, P3
[9]  
Day, 1956, SUBCONTRACTING POLIC
[10]   STRONG NP-COMPLETENESS RESULTS - MOTIVATION, EXAMPLES, AND IMPLICATIONS [J].
GAREY, MR ;
JOHNSON, DS .
JOURNAL OF THE ACM, 1978, 25 (03) :499-508