共 13 条
[1]
[Anonymous], 2001, J INFRASTRUCTURE SYS
[2]
Guignier F., 1999, Journal of infrastructure systems, V5, P124, DOI DOI 10.1061/(ASCE)1076-0342(1999)5:4(124)
[3]
Hegazy T., 1999, Cost Engineering, V41, P26
[4]
Hegazy T., 2002, Computer-based construction project management
[6]
Lumsden P., 1968, LINE BALANCE METHOD
[7]
*MICR CORP, 2000, MICR PROJ 2000
[8]
SCHEDULING OF REPETITIVE PROJECTS WITH COST OPTIMIZATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1993, 119 (04)
:681-697
[9]
RPM - REPETITIVE PROJECT MODELING
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1990, 116 (02)
:316-330
[10]
*RS MEANS CO, 2000, MEANS BUILD CONSTR C