共 28 条
[1]
Altintas I, 2004, 16TH INTERNATIONAL CONFERENCE ON SCIENTIFIC AND STATISTICAL DATABASE MANAGEMENT, PROCEEDINGS, P423
[3]
Blaha P., 2001, CALCULATING CRYST PR, V60
[4]
Eswaradass A, 2006, SIXTH IEEE INTERNATIONAL SYMPOSIUM ON CLUSTER COMPUTING AND THE GRID, P265
[5]
FAHRINGER T, 2005, 6 INT WORKSH GRID CO
[6]
Felix S., 2006, 2 AUSTR GRID S INNSB
[7]
Gelenbe E., 1986, Parallel Algorithms and Architectures. Proceedings of the International Workshop, P127
[8]
GIBBONS R, 1997, JOB SCHEDULING STRAT
[10]
A probabilistic model to analyse workflow performance on production grids
[J].
CCGRID 2008: EIGHTH IEEE INTERNATIONAL SYMPOSIUM ON CLUSTER COMPUTING AND THE GRID, VOLS 1 AND 2, PROCEEDINGS,
2008,
:510-+

