A new method of enhancing reliability for transmission expansion planning

被引:12
作者
Li, Chengxin [1 ]
Chen, Guo [2 ]
Liu, Junyong [1 ]
机构
[1] Sichuan Univ, Sch Elect Engn & Informat, Chengdu 610065, Peoples R China
[2] Univ Sydney, Sch Elect & Informat Engn, Camperdown, NSW 2006, Australia
关键词
Probabilistic reliability evaluation; Sensitivity analysis; Monte Carlo simulation; DC model; POWER-SYSTEMS; MODEL; GENERATION;
D O I
10.1007/s40565-014-0080-0
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
The reliability plays a significant role in power systems and it is an important objective or constraint in transmission expansion planning. Firstly, a DC optimization model was proposed to calculate the maximum arrival power at each load point. Compared to the network flow method, DC model is closer to the actual power flow and it is able to obtain more realistic reliability assessment results. Furthermore, a novel sensitivity index (SI) was also proposed to choose the most effective line so as to enhance the nodal and/or system reliability. The Monte Carlo simulation is used to simulate the system components state. This improved reliability evaluation method and SI can be used for transmission expansion planning or maintenance scheduling. Tests are performed using 6-bus system derived from the Garver's system and the IEEE 10-machine 39-bus system. The results show the effectiveness of the method.
引用
收藏
页码:341 / 349
页数:9
相关论文
共 31 条
[1]
Generation and Transmission Expansion Planning: MILP-Based Probabilistic Model [J].
Aghaei, Jamshid ;
Amjady, Nima ;
Baharvandi, Amir ;
Akbari, Mohammad-Amin .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (04) :1592-1601
[2]
Reliability constrained coordination of generation and transmission expansion planning in power systems using mixed integer programming [J].
Alizadeh, B. ;
Jadid, S. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2011, 5 (09) :948-960
[3]
[Anonymous], 1002639 EPRI
[4]
[Anonymous], 2005, Risk Assessment Of Power Systems: Models, Methods, and Applications
[5]
Reliability and Sensitivity Analysis of Composite Power Systems Under Emission Constraints [J].
Benidris, Mohammed ;
Mitra, Joydeep .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (01) :404-412
[6]
Billinton R, 2013, Reliability assessment of electrical power systems using Monte Carlo methods
[7]
A method for transmission system expansion planning considering probabilistic reliability criteria [J].
Choi, J ;
Tran, T ;
El-Keib, ARA ;
Thomas, R ;
Oh, S ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1606-1615
[8]
Development of a nodal effective load model considering transmission system element unavailabilities [J].
Choi, J ;
Billinton, R ;
Futuhi-Firuzabed, M .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2005, 152 (01) :79-89
[9]
Transmission expansion planning using contingency criteria [J].
Choi, Jaeseok ;
Mount, Timothy D. ;
Thomas, Robert J. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :2249-2261
[10]
A multiyear dynamic transmission expansion planning model using a discrete based EPSO approach [J].
da Rocha, Manuel Costeira ;
Saraiva, Joao Tome .
ELECTRIC POWER SYSTEMS RESEARCH, 2012, 93 :83-92