The construction of stable project baseline schedules

被引:115
作者
Herroelen, W [1 ]
Leus, R [1 ]
机构
[1] Catholic Univ Louvain, Dept Appl Econ, Operat Management Grp, B-3000 Louvain, Belgium
关键词
project management and scheduling; uncertainty modelling; stability;
D O I
10.1016/S0377-2217(03)00130-9
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The vast majority of project scheduling efforts assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. In reality, however, project activities are subject to considerable uncertainty, which generally leads to numerous schedule disruptions. It is of interest to develop pre-schedules that can absorb disruptions in activity durations without affecting the planning of other activities, such that co-ordination of resources and material procurement for each of the activities can be performed as smoothly as possible. The objective of this paper is to develop and evaluate various approaches for constructing a stable pre-schedule, which is unlikely to undergo major changes when it needs to be repaired as a reaction to minor activity duration disruptions. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:550 / 565
页数:16
相关论文
共 31 条
[1]  
ADLAKHA VG, 1989, INFOR, V27, P272
[2]   The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure [J].
Ahn, T ;
Erenguc, SS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) :250-259
[3]  
Ahuja RK, 1993, NETWORK FLOWS THEORY
[4]   Match-up scheduling under a machine breakdown [J].
Akturk, MS ;
Gorgulu, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :81-97
[5]  
ALAGOZ O, 2003, EUROPEAN J OPERATION, V149
[6]  
[Anonymous], 2001, THESIS TU BERLIN BER
[7]   MATCHUP SCHEDULING WITH MULTIPLE RESOURCES, RELEASE DATES AND DISRUPTIONS [J].
BEAN, JC ;
BIRGE, JR ;
MITTENTHAL, J ;
NOON, CE .
OPERATIONS RESEARCH, 1991, 39 (03) :470-483
[8]   Procedures for providing robust gate assignments for arriving aircrafts [J].
Bolat, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (01) :63-80
[9]   CRITICALITY IN RESOURCE CONSTRAINED NETWORKS [J].
BOWERS, JA .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1995, 46 (01) :80-91
[10]  
Chapman C.B., 1997, PROJECT RISK MANAGEM