The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure

被引:30
作者
Ahn, T
Erenguc, SS [1 ]
机构
[1] Univ Florida, Coll Business Adm, Dept Informat & Decis Sci, Gainesville, FL 32611 USA
[2] Soongsil Univ, Coll Commerce & Econ, Sch Management, Seoul, South Korea
关键词
resource constrained project scheduling; crashable modes; activity cost; project cost; penalty cost;
D O I
10.1016/S0377-2217(97)00331-7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We present a heuristic procedure for a nonpreemptive resource constrained project scheduling problem in which the duration/cost of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. This problem is a natural combination of the time/cost trade-off problem and the resource constrained project scheduling problem. The objective is to determine each activity's start (finish) time, mode and duration so that the total project cost is minimized. Total project cost is the sum of all activity costs and the penalty cost for completing the project beyond its due date. We introduce a multi-pass algorithm. We report computational results with a set of 100 test problems and demonstrate the efficacy of the proposed heuristic procedure. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:250 / 259
页数:10
相关论文
共 18 条
[1]   RESOURCE-ALLOCATION IN A PERT NETWORK UNDER CONTINUOUS ACTIVITY TIME-COST FUNCTIONS [J].
BERMAN, EB .
MANAGEMENT SCIENCE, 1964, 10 (04) :734-745
[2]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[3]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[4]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[5]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[6]   A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
DEMEULEMEESTER, E ;
HERROELEN, W .
MANAGEMENT SCIENCE, 1992, 38 (12) :1803-1818
[7]   NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DREXL, A ;
GRUENEWALD, J .
IIE TRANSACTIONS, 1993, 25 (05) :74-81
[8]   CRITICAL PATH PROBLEMS WITH CONCAVE COST-TIME CURVES [J].
FALK, JE ;
HOROWITZ, JL .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1972, 19 (04) :446-455
[9]   A NETWORK FLOW COMPUTATION FOR PROJECT COST CURVES [J].
FULKERSON, DR .
MANAGEMENT SCIENCE, 1961, 7 (02) :167-178
[10]   CRITICAL-PATH PLANNING AND SCHEDULING - MATHEMATICAL BASIS [J].
KELLEY, JE .
OPERATIONS RESEARCH, 1961, 9 (03) :296-320