Dynamic planning of distributed generation units in active distribution network

被引:65
作者
Abapour, Saeed [1 ]
Zare, Kazem [1 ]
Mohammadi-Ivatloo, Behnam [1 ]
机构
[1] Univ Tabriz, Fac Elect & Comp Engn, Dept Elect Power Engn, Tabriz, Iran
关键词
WIND GENERATION; LOSS REDUCTION; DG PLACEMENT; IMPACT; RELIABILITY; PENETRATION; MODEL;
D O I
10.1049/iet-gtd.2014.1143
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study proposes long-term dynamic planning of distributed generation (DG) units in distribution networks considering active management (AM). In the AM operation mode, the distribution network equipment is controlled in real time based on the real-time measurements of system parameters (voltage and current). The proposed model determines the optimal size, location and time of investment of DG units. The uncertainty of energy price and rate of load growth is handled using a scenario-based modelling approach. To demonstrate the advantages of dynamic DG planning, its results are compared with those of static model. Also the results of optimal DG planning in active network are compared with those of the passive operation mode. In addition, a technical evaluation and comparison between conventional, passive and active networks have been performed. The proposed model is successfully applied to the 33-bus radial distribution network. The results indicate that using AM, the cost function and losses are decreased effectively compared to the passive management. Computation of the optimal DG planning in AM environment is formulated as a mixed integer non-linear problem which can be solved using commercial optimisation packages like as GAMS.
引用
收藏
页码:1455 / 1463
页数:9
相关论文
共 32 条
[11]   Dispersed generation impact on distribution networks [J].
Hadjsaid, N ;
Canard, JF ;
Dumas, F .
IEEE COMPUTER APPLICATIONS IN POWER, 1999, 12 (02) :22-28
[12]   A method for placement of DG units in distribution networks [J].
Hedayati, Hasan ;
Nabaviniaki, S. A. ;
Akbarimajd, Adel .
IEEE TRANSACTIONS ON POWER DELIVERY, 2008, 23 (03) :1620-1628
[13]   Ordinal optimisation approach for locating and sizing of distributed generation [J].
Jabr, R. A. ;
Pal, B. C. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2009, 3 (08) :713-723
[14]   DG allocation with application of dynamic programming for loss reduction and reliability improvement [J].
Khalesi, N. ;
Rezaei, N. ;
Haghifam, M. -R. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (02) :288-295
[15]   Multiobjective distributed generation placement using fuzzy goal programming with genetic algorithm [J].
Kim, Kyu-Ho ;
Song, Kyung-Bin ;
Joo, Sung-Kwan ;
Lee, Yu-Jeong ;
Kim, Jin-O .
EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2008, 18 (03) :217-230
[16]   Maximising penetration of wind generation in existing distribution networks [J].
Liew, SN ;
Strbac, G .
IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2002, 149 (03) :256-262
[17]   Location and contract pricing of distributed generation using a genetic algorithm [J].
Lopez-Lezama, Jesus Maria ;
Contreras, Javier ;
Padilha-Feltrin, Antonio .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 36 (01) :117-126
[18]  
Mouti AFS, 2011, IEEE T POWER DELIVER, V26, P2090, DOI DOI 10.1109/TPWRD.2011.2158246]
[19]   A Dynamic Approach for Distribution System Planning Considering Distributed Generation [J].
Naderi, Ehsan ;
Seifi, Hossein ;
Sepasian, Mohammad Sadegh .
IEEE TRANSACTIONS ON POWER DELIVERY, 2012, 27 (03) :1313-1322
[20]   An Improved Multi-Objective Harmony Search for Optimal Placement of DGs in Distribution Systems [J].
Nekooei, Komail ;
Farsangi, Malihe M. ;
Nezamabadi-Pour, Hossein ;
Lee, Kwang Y. .
IEEE TRANSACTIONS ON SMART GRID, 2013, 4 (01) :557-567