Search heuristics for resource constrained project scheduling

被引:87
作者
Lee, JK [1 ]
Kim, YD [1 ]
机构
[1] KOREA ADV INST SCI & TECHNOL, DEPT IND ENGN, TAEJON 305701, SOUTH KOREA
关键词
heuristics; project management; search;
D O I
10.1057/jors.1996.79
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We develop a search procedure for project scheduling problems with multiple resource constraints as well as precedence constraints. The procedure is applied to three popular search heuristics, simulated annealing, tabu search and genetic algorithms. In the heuristics, a solution is represented with a string of numbers each of which denotes priority of each activity. The priorities are used to select an activity for scheduling among competing ones. The search heuristics with this encoding method can always generate feasible neighbourhood solutions for a given solution. Moreover, this encoding method is very flexible in that problems with objective functions of a general functional form (such as a nonlinear function) and complex constraints can be considered without much difficulty. Results of computational tests on the performance of the search heuristics showed that the search heuristics, especially the simulated annealing and tabu search algorithms worked better than existing heuristics.
引用
收藏
页码:678 / 689
页数:12
相关论文
共 43 条
[1]  
Anderson E. J., 1994, ORSA Journal on Computing, V6, P161, DOI 10.1287/ijoc.6.2.161
[2]  
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[3]  
2-7
[4]  
BELL CE, 1990, NAV RES LOG, V37, P61, DOI 10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO
[5]  
2-S
[6]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[7]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[8]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[9]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[10]   A BRANCH-AND-BOUND PROCEDURE FOR THE MULTIPLE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM [J].
DEMEULEMEESTER, E ;
HERROELEN, W .
MANAGEMENT SCIENCE, 1992, 38 (12) :1803-1818