Financial analysis and optimal size and operation for a multicarrier energy system

被引:98
作者
Sheikhi, A. [1 ]
Ranjbar, A. M. [1 ]
Oraee, H. [1 ]
机构
[1] Islamic Azad Univ, Dept Elect Engn, Sci & Res Branch, Tehran, Iran
关键词
Combined cooling heating and power (CCHP); Energy hub; Optimal operation; Optimal size; Financial analysis;
D O I
10.1016/j.enbuild.2012.01.011
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The interest on distributed generation has been increasing in recent years, mainly due to technical development on generation systems that meet environmental and energy policy concerns. One of the most important distributed energy technologies is combined cooling, heat and power (CCHP) systems. CCHP is a small and self-contained electric, heating and cooling generation plant that can provide power for household applications, commercial or industrial facilities. It can reduce power loss and enhance service reliability in distribution systems. An important factor for the users is the capital cost of CCHP which is largely dependent on its type, capacity and efficiency. Therefore, among all existing commercial CCHP technologies, certain economic choices are to be taken into account. Cost and benefit analysis (CBA) is one of the most common approaches to maximize financial benefits. In this paper, a model to find the optimal size and operation of CCHP, auxiliary boiler, heat and electrical storage unit for users is proposed by considering an integrated view of electricity and natural gas network using GAMS software. Then, as a case study, for a hotel in Tehran, this method is implemented. Finally, by applying COMFAR Ill software, useful financial parameters are calculated for the proposed multicarrier energy system with optimal elements. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:71 / 78
页数:8
相关论文
共 34 条
[1]  
Abdelaziz A.R., 2006, IEEE BOL POW C BOL I
[2]  
American Society of Heating Refrigerating and Air-Conditioning Engineers, 2009, ASHRAE HANDB HVAC SY
[3]  
[Anonymous], 2007, POWER SYST LAB
[4]  
[Anonymous], 1992, RELIABILITY EVALUATI
[5]  
Asano H., 2006, 29 IAEE INT C POTSD
[6]   Impact of Strategic Deployment of CHP-Based DERs on Microgrid Reliability [J].
Basu, Ashoke Kumar ;
Chowdhury, Sunetra ;
Chowdhury, S. P. .
IEEE TRANSACTIONS ON POWER DELIVERY, 2010, 25 (03) :1697-1705
[7]  
Bouwmans I., 2002, 2 INT S POW SYST MAR
[8]   A new approach to exergoeconomic analysis and design of variable demand energy systems [J].
Cardona, E ;
Piacentino, A .
ENERGY, 2006, 31 (04) :490-515
[9]  
Cho H., 2009, ENERGY BUILDINGS, V41
[10]   Evaluation of CCHP systems performance based on operational cost, primary energy consumption, and carbon dioxide emission by utilizing an optimal operation scheme [J].
Cho, Heejin ;
Mago, Pedro J. ;
Luck, Rogelio ;
Chamra, Louay M. .
APPLIED ENERGY, 2009, 86 (12) :2540-2549