Optimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plant

被引:9
作者
Duarte, Belmiro P. M. [1 ,2 ]
Santos, Lino O. [2 ]
Mariano, Jorge S. [1 ]
机构
[1] Polytech Inst Coimbra, ISEC, Dept Chem Engn, P-3030199 Coimbra, Portugal
[2] Univ Coimbra, Dept Chem Engn, CIEPQPF, GEPSI PSE Grp, P-3030790 Coimbra, Portugal
关键词
Sizing; Scheduling; Resource task network; Mixed-integer linear programming; Ceramic industry; CONTINUOUS-TIME FORMULATIONS; MULTIPURPOSE BATCH PLANTS; GENETIC ALGORITHMS; GENERAL ALGORITHM; OPTIMAL-DESIGN; DISCRETE; OPTIMIZATION; OPERATIONS;
D O I
10.1016/j.cor.2008.05.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses the optimal design of the grinding section of a ceramic tile plant operating in a cyclic mode with the units (mills) following a batch sequence. The optimal design problem of this single product plant is formulated with a fixed time horizon of one week, corresponding to one cycle of production, and using a discrete-time resource task network (RTN) process representation. The size of the individual units is restricted to discrete values, and the plant operates with a set of limited resources (workforce and equipment). The goal is to determine the optimal number and size of the mills to install in the grinding section, the corresponding production schedule, and shift policy. This problem involves labor/semi-labor intensive (LI/SLI) units with a depreciation cost of the same order as that of the operation cost. The optimal design of the grinding section comprises the trade-off between these two costs. The resulting optimization formulation is of the form of a mixed integer linear programming (MILP) problem, solved using a branch and bound solver (CPLEX 9.0.2). The optimal solution is analyzed for various ceramic tile productions and different shift policies.
引用
收藏
页码:1825 / 1834
页数:10
相关论文
共 25 条
[1]   DETAILED DESIGN OF MULTIPURPOSE BATCH PLANTS [J].
BARBOSAPOVOA, AP ;
MACCHIETTO, S .
COMPUTERS & CHEMICAL ENGINEERING, 1994, 18 (11-12) :1013-1042
[2]  
BARBOSAPOVOA APF, 1999, COMPUT CHEM ENG S, V23, P7
[3]  
BROOKE A, 1998, AMS USERS GUIDE
[4]   Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations [J].
Castro, PM ;
Barbosa-Póvoa, AP ;
Novais, AQ .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2005, 44 (02) :343-357
[5]   Simple continuous-time formulation for short-term scheduling of batch and continuous processes [J].
Castro, PM ;
Barbosa-Póvoa, AP ;
Matos, HA ;
Novais, AQ .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (01) :105-118
[6]   Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations:: A case study approach [J].
Castro, PM ;
Barbosa-Póvoa, AP ;
Matos, HA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (14) :3346-3360
[7]   Synthesis and optimization of the recovery route for residual products under uncertain product demand [J].
Duque, Joaquim ;
Barbosa-Povoa, Ana Paula F. D. ;
Novais, Augusto Q. .
COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (05) :1463-1490
[8]   Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review [J].
Floudas, CA ;
Lin, XX .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (11) :2109-2129
[9]   Enterprise-wide optimization: A new frontier in process systems engineering [J].
Grossmann, I .
AICHE JOURNAL, 2005, 51 (07) :1846-1857
[10]   Planning and scheduling in the process industry [J].
Kallrath J. .
OR Spectrum, 2002, 24 (3) :219-250