A resource-task network approach for optimal short-term/periodic scheduling and heat integration in multipurpose batch plants

被引:34
作者
Chen, Cheng-Liang [1 ]
Chang, Chia-Yuan [1 ]
机构
[1] Natl Taiwan Univ, Dept Chem Engn, Taipei 10617, Taiwan
关键词
Multi-purpose batch processes; Short-term scheduling; Periodic scheduling; Heat integration; Mixed-integer linear program (MILP); INTEGER MATHEMATICAL FORMULATION; CONTINUOUS-TIME; MILP FORMULATION; OPTIMAL-DESIGN; FACILITIES; DISCRETE; ENERGY;
D O I
10.1016/j.applthermaleng.2008.06.014
中图分类号
O414.1 [热力学];
学科分类号
摘要
This article aims to integrate the task scheduling and heat recovery problems into an unified framework for multi-purpose batch processes. The batch scheduling formulation is extended from the continuous Resource-Task Network (RTN) formulation which was originally proposed by Castro et al. [P.M. Castro, A.P. Barbosa-Povoa, H.A. Matos, Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations: a case study approach, Ind. Eng. Chem. Res. 42 (2003) 3346-3360; P.M. Castro, A.P. Barbosa-Povoa, H.A. Matos, A.Q. Novais, Simple continuous-time formulation for short-term scheduling of batch and continuous processes, Ind. Eng. Chem. Res. 43 (2004) 105-118]. Besides the integrated heat recovery and short-term batch scheduling, a full set of heat-integrated periodic scheduling for batch processes, which is more useful in industrial environments, is also presented. The heat-integrated batch scheduling problem can be formulated as a mixed-integer linear program (MILP), where the new formulation can also be solved in standalone or heat-integrated modes by user's preferences. In the heat-integrated mode, the processes can be precisely defined while keeping the operation flexibility with slightly expanded model size. Two literature examples are demonstrated to show the efficiency and flexibility of the model. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1195 / 1208
页数:14
相关论文
共 21 条
[1]   Optimal design of heat-integrated multipurpose batch facilities:: a mixed-integer mathematical formulation [J].
Barbosa-Póvoa, APFD ;
Pinto, T ;
Novais, AQ .
COMPUTERS & CHEMICAL ENGINEERING, 2001, 25 (4-6) :547-559
[2]  
BROOKE A, 2003, GAMS USERS GUIDE
[3]   Simple continuous-time formulation for short-term scheduling of batch and continuous processes [J].
Castro, PM ;
Barbosa-Póvoa, AP ;
Matos, HA ;
Novais, AQ .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2004, 43 (01) :105-118
[4]   Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations:: A case study approach [J].
Castro, PM ;
Barbosa-Póvoa, AP ;
Matos, HA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (14) :3346-3360
[5]   Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review [J].
Floudas, CA ;
Lin, XX .
COMPUTERS & CHEMICAL ENGINEERING, 2004, 28 (11) :2109-2129
[6]   IMPROVED LINEAR INTEGER PROGRAMMING FORMULATIONS OF NONLINEAR INTEGER PROBLEMS [J].
GLOVER, F .
MANAGEMENT SCIENCE, 1975, 22 (04) :455-460
[7]   SYNTHESIS OF MAXIMUM ENERGY RECOVERY NETWORKS IN BATCH PROCESSES [J].
JUNG, SH ;
LEE, IB ;
YANG, DR ;
CHANG, KS .
KOREAN JOURNAL OF CHEMICAL ENGINEERING, 1994, 11 (03) :162-171
[8]  
KEMP IC, 1989, CHEM ENG RES DES, V67, P495
[9]  
Kemp IC., 2007, Pinch analysis and process integration. A user guide on process integration for the efficient use of energy
[10]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227