Water resources management under multi-parameter interactions: A factorial multi-stage stochastic programming approach

被引:53
作者
Zhou, Yang [1 ]
Huang, Guo H. [1 ]
Yang, Boting [2 ]
机构
[1] Univ Regina, Fac Engn, Regina, SK S4S 0A2, Canada
[2] Univ Regina, Dept Comp Sci, Regina, SK S4S 0A2, Canada
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2013年 / 41卷 / 03期
关键词
Stochastic programming; Multi-stage; Factorial analysis; Decision making; Water resources management; CAPACITY EXPANSION; ROBUST OPTIMIZATION; UNCERTAINTY; MODEL; DECISIONS;
D O I
10.1016/j.omega.2012.07.005
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper proposes a factorial multi-stage stochastic programming (FMSP) approach to support water resources management under uncertainty. This approach was developed based on the conventional inexact multi-stage stochastic programming method. Five alternative inexact multi-stage stochastic programming algorithms in addition to the conventional algorithm were introduced and bundled to offer multiple decision options that reflect decision makers' perspectives and the complexities in system uncertainties. More importantly, factorial analysis, a multivariate inference method, was introduced into the modeling framework to analyze the potential interrelationships among a variety of uncertain parameters and their impacts on system performance. The proposed approach was applied to a water resources management case. The desired water-allocation schemes were obtained to assist in maximizing the total net benefit of the system. Multiple uncertain parameters and their interactions were examined, and those that had significant influences on system performance were identified. For example, the medium flow in the third planning period was the system objective's most influential factor. Any variation of this factor would significantly influence the acquisition of the total net benefit in the community. The significant interactions were also identified, such as the interaction between the agricultural sector's penalty and the medium flow in the third planning period. Through the analysis of multi-parameter interactions, the interrelationships among the uncertain parameters could be further revealed. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:559 / 573
页数:15
相关论文
共 30 条
[21]  
Loucks D.P., 1981, WATER RESOURCES SYST
[22]  
MALCOLM SA, 1994, J OPER RES SOC, V45, P1040, DOI 10.1038/sj/jors/0450906
[23]   An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty [J].
Maqsood, M ;
Huang, GH ;
Yeomans, JS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 167 (01) :208-225
[24]  
Montgomery D.C., 2001, Design and Analysis of Experiments
[25]  
Montgomery D.C., 2009, Engineering statistics
[26]   A multi-stage stochastic supply network design problem with financial decisions and risk management [J].
Nickel, Stefan ;
Saldanha-da-Gama, Francisco ;
Ziegler, Hans-Peter .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2012, 40 (05) :511-524
[27]   MULTISTAGE STOCHASTIC OPTIMIZATION APPLIED TO ENERGY PLANNING [J].
PEREIRA, MVF ;
PINTO, LMVG .
MATHEMATICAL PROGRAMMING, 1991, 52 (02) :359-375
[28]   Multistage stochastic programming model for electric power capacity expansion problem [J].
Shiina, T ;
Birge, JR .
JAPAN JOURNAL OF INDUSTRIAL AND APPLIED MATHEMATICS, 2003, 20 (03) :379-397
[29]   Interactive two-stage stochastic fuzzy programming for water resources management [J].
Wang, S. ;
Huang, G. H. .
JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2011, 92 (08) :1986-1995
[30]   Factorial two-stage stochastic programming for water resources management [J].
Zhou, Y. ;
Huang, G. H. .
STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2011, 25 (01) :67-78