Developing project duration models in software engineering

被引:17
作者
Bourque, Pierre [1 ]
Oligny, Serge
Abran, Alain
Fournier, Bertrand
机构
[1] Ecole Technol Super, Montreal, PQ, Canada
[2] Bell Canada, Montreal, PQ, Canada
[3] Univ Quebec, Montreal, PQ H3C 3P8, Canada
关键词
international software benchmarking standards group (ISBSG); project duration models; project scheduling models; schedule and organizational issues; software engineering; time estimation;
D O I
10.1007/s11390-007-9051-5
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Based on the empirical analysis of data contained in the International Software Benchmarking Standards Group (ISBSG) repository, this paper presents software engineering project duration models based on project effort. Duration models are built for the entire dataset and for subsets of projects developed for personal computer, mid-range and mainframe platforms. Duration models are also constructed for projects requiring fewer than 400 person-hours of effort and for projects requiring more than 400 person-hours of effort. The usefulness of adding the maximum number of assigned resources as a second independent variable to explain duration is also analyzed. The opportunity to build duration models directly from project functional size in function points is investigated as well.
引用
收藏
页码:348 / 357
页数:10
相关论文
共 22 条
[11]   A comparative study of two software development cost modeling techniques using multi-organizational and company-specific data [J].
Jeffery, R ;
Ruhe, M ;
Wieczorek, I .
INFORMATION AND SOFTWARE TECHNOLOGY, 2000, 42 (14) :1009-1016
[12]   DETERMINING SOFTWARE SCHEDULES [J].
JONES, C .
COMPUTER, 1995, 28 (02) :73-75
[13]  
JONES C, 2002, CROSSTALK J DEFENSE, V15
[14]   An empirical study of maintenance and development estimation accuracy [J].
Kitchenham, B ;
Pfleeger, SL ;
McColl, B ;
Eagan, S .
JOURNAL OF SYSTEMS AND SOFTWARE, 2002, 64 (01) :57-77
[15]   Preliminary guidelines for empirical research in software engineering [J].
Kitchenham, BA ;
Pfleeger, SL ;
Pickard, LM ;
Jones, PW ;
Hoaglin, DC ;
El Emam, K ;
Rosenberg, J .
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2002, 28 (08) :721-734
[16]   EMPIRICAL-STUDIES OF ASSUMPTIONS THAT UNDERLIE SOFTWARE COST-ESTIMATION MODELS [J].
KITCHENHAM, BA .
INFORMATION AND SOFTWARE TECHNOLOGY, 1992, 34 (04) :211-218
[17]   Organizational benchmarking using the ISBSG data repository [J].
Lokan, C ;
Wright, T ;
Hill, PR ;
Stringer, M .
IEEE SOFTWARE, 2001, 18 (05) :26-+
[18]  
PARK R. E., 1994, SOFTWARE COST SCHEDU
[19]   An empirical study using task assignment patterns to improve the accuracy of software effort estimation [J].
Smith, RK ;
Hale, JE ;
Parrish, AS .
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2001, 27 (03) :264-271
[20]   An empirical validation of the relationship between the magnitude of relative error and project size [J].
Stensrud, E ;
Foss, T ;
Kitchenham, B ;
Myrtveit, I .
EIGHTH IEEE SYMPOSIUM ON SOFTWARE METRICS, PROCEEDINGS, 2002, :3-12