Exact formulation of stochastic EMQ model for an unreliable production system

被引:42
作者
Giri, BC [1 ]
Dohi, T [1 ]
机构
[1] Hiroshima Univ, Dept Informat Engn, Higashihiroshima 7398527, Japan
关键词
EMQ; stochastic machine breakdown; corrective and preventive repairs; net present value;
D O I
10.1057/palgrave.jors.2601840
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The purpose of this paper is to present an exact formulation of stochastic EMQ model for an unreliable production system under a general framework in which the time to machine failure, corrective (emergency) and preventive (regular) repair times are assumed to be random variables. For exact financial implications of the lot-sizing decisions, the EMQ model is formulated based on the net present value (NPV) approach. Then, by taking limitation on the discount rate, the traditional long-run average cost model is obtained. The criteria for the existence and uniqueness of the optimal production time in both the models are derived under general failure and specific repair time distributions. Numerical examples are devoted to find the optimal production policies of the developed models and examine the sensitivity of the parameters involved. Computational results show that the optimal decision based on the NPV approach is superior to that based on the long-run average cost approach, though the performance level strongly depends on the pertinent failure and repair time distributions.
引用
收藏
页码:563 / 575
页数:13
相关论文
共 38 条
[1]   A simple approximation of the EMQ model with Poisson machine failures [J].
Abboud, NE .
PRODUCTION PLANNING & CONTROL, 1997, 8 (04) :385-397
[2]  
[Anonymous], 1974, DECIS SCI J
[3]   PRODUCTION-INVENTORY SYSTEMS WITH UNRELIABLE MACHINES [J].
BERG, M ;
POSNER, MJM ;
ZHAO, H .
OPERATIONS RESEARCH, 1994, 42 (01) :111-118
[4]   OPTIMALITY OF ZERO-INVENTORY POLICIES FOR UNRELIABLE MANUFACTURING SYSTEMS [J].
BIELECKI, T ;
KUMAR, PR .
OPERATIONS RESEARCH, 1988, 36 (04) :532-541
[5]   THE EOQ MODEL WITH STOCHASTIC DEMAND AND DISCOUNTING [J].
CHAO, HP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (03) :434-443
[6]  
Cheung KL, 1997, NAV RES LOG, V44, P257, DOI 10.1002/(SICI)1520-6750(199704)44:3<257::AID-NAV2>3.0.CO
[7]  
2-7
[8]   Bounds for production lot sizing with machine breakdowns [J].
Chung, KJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 32 (01) :139-144
[9]  
DOHI T, 1992, RAIRO-RECH OPER, V26, P1
[10]   Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment [J].
Dohi, T ;
Okamura, H ;
Osaki, S .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 74 (1-3) :147-155