Bounds for production lot sizing with machine breakdowns

被引:63
作者
Chung, KJ
机构
关键词
D O I
10.1016/S0360-8352(96)00207-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
H. Groenevelt, L. Pintelon, and A. Seidmann (Management Science 38, 104-123, 1992) present two novel extensions to the EMQ model. These extensions are aimed at incorporating stochastic machine breakdowns and deal with analysing the optimal lot size and the associated reorder policy. The purpose of this paper is to give bounds to optimal lot sizes for the above two extensions. With these bounds, a simple algorithm to locate the optimal lot sizes will be developed. Copyright (C) 1997 Elsevier Science Ltd
引用
收藏
页码:139 / 144
页数:6
相关论文
共 13 条
[1]  
[Anonymous], 1996, Calculus and Analytic Geometry
[2]   PRODUCTION-INVENTORY SYSTEMS WITH UNRELIABLE MACHINES [J].
BERG, M ;
POSNER, MJM ;
ZHAO, H .
OPERATIONS RESEARCH, 1994, 42 (01) :111-118
[3]   OPTIMALITY OF ZERO-INVENTORY POLICIES FOR UNRELIABLE MANUFACTURING SYSTEMS [J].
BIELECKI, T ;
KUMAR, PR .
OPERATIONS RESEARCH, 1988, 36 (04) :532-541
[4]   OPTIMAL MAINTENANCE POLICIES FOR SINGLE-SERVER QUEUING-SYSTEMS SUBJECT TO BREAKDOWNS [J].
FEDERGRUEN, A ;
SO, KC .
OPERATIONS RESEARCH, 1990, 38 (02) :330-343
[5]   PRODUCTION LOT SIZING WITH MACHINE BREAKDOWNS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
MANAGEMENT SCIENCE, 1992, 38 (01) :104-123
[6]   PRODUCTION BATCHING WITH MACHINE BREAKDOWNS AND SAFETY STOCKS [J].
GROENEVELT, H ;
PINTELON, L ;
SEIDMANN, A .
OPERATIONS RESEARCH, 1992, 40 (05) :959-971
[7]   THE ANALYSIS OF A PRODUCTION LINE WITH UNRELIABLE MACHINES AND RANDOM PROCESSING TIMES [J].
HONG, YS ;
GLASSEY, CR ;
SEONG, D .
IIE TRANSACTIONS, 1992, 24 (01) :77-83
[8]  
Hsu L.-F., 1987, QUEUEING SYST, V2, P333, DOI [10.1007/BF01150045, DOI 10.1007/BF01150045]
[9]   SINGLE-STAGE AND SERIAL PRODUCTION LINE SYSTEMS WITH UNRELIABLE MACHINES AND GENERAL PROBABILITY-DISTRIBUTIONS [J].
KOULAMAS, CP .
DECISION SCIENCES, 1993, 24 (02) :343-369
[10]   ANALYSIS OF A PRODUCTION-INVENTORY SYSTEM WITH UNRELIABLE PRODUCTION FACILITY [J].
POSNER, MJM ;
BERG, M .
OPERATIONS RESEARCH LETTERS, 1989, 8 (06) :339-345