Effect of uncertainty in land use, damage models and inundation depth on flood damage estimates

被引:286
作者
de Moel, H. [1 ]
Aerts, J. C. J. H. [1 ]
机构
[1] Vrije Univ Amsterdam, Inst Environm Studies, NL-1081 HV Amsterdam, Netherlands
关键词
Floods; Flood risk; Flood damage; Flood damage assessment; Uncertainty; Sensitivity; RISK; CLASSIFICATION; ACCURACY;
D O I
10.1007/s11069-010-9675-6
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
With the recent transition to a more risk-based approach in flood management, flood risk models-being a key component in flood risk management-are becoming increasingly important. Such models combine information from four components: (1) the flood hazard (mostly inundation depth), (2) the exposure (e.g. land use), (3) the value of elements at risk and (4) the susceptibility of the elements at risk to hydrologic conditions (e.g. depth-damage curves). All these components contain, however, a certain degree of uncertainty which propagates through the calculation and accumulates in the final damage estimate. In this study, an effort has been made to assess the influence of uncertainty in these four components on the final damage estimate. Different land-use data sets and damage models have been used to represent the uncertainties in the exposure, value and susceptibility components. For the flood hazard component, inundation depth has been varied systematically to estimate the sensitivity of flood damage estimations to this component. The results indicate that, assuming the uncertainty in inundation depth is about 25 cm (about 15% of the mean inundation depth), the total uncertainty surrounding the final damage estimate in the case study area can amount to a factor 5-6. The value of elements at risk and depth-damage curves are the most important sources of uncertainty in flood damage estimates and can both introduce about a factor 2 of uncertainty in the final damage estimates. Very large uncertainties in inundation depth would be necessary to have a similar effect on the uncertainty of the final damage estimate, which seem highly unrealistic. Hence, in order to reduce the uncertainties surrounding potential flood damage estimates, these components deserve prioritisation in future flood damage research. While absolute estimates of flood damage exhibit considerable uncertainty (the above-mentioned factor 5-6), estimates for proportional changes in flood damages (defined as the change in flood damages as a percentage of a base situation) are much more robust.
引用
收藏
页码:407 / 425
页数:19
相关论文
共 57 条
  • [1] Aerts J., 2008, AANDACHT VEILIGHEID, P3
  • [2] [Anonymous], 2008, 42008 EEA JTCWHO
  • [3] A probabilistic modelling system for assessing flood risks
    Apel, H
    Thieken, AH
    Merz, B
    Blöschl, G
    [J]. NATURAL HAZARDS, 2006, 38 (1-2) : 79 - 100
  • [4] Flood risk assessment and associated uncertainty
    Apel, H
    Thieken, AH
    Merz, B
    Blöschl, G
    [J]. NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2004, 4 (02) : 295 - 308
  • [5] Flood risk analyses-how detailed do we need to be?
    Apel, H.
    Aronica, G. T.
    Kreibich, H.
    Thieken, A. H.
    [J]. NATURAL HAZARDS, 2009, 49 (01) : 79 - 98
  • [6] Quantification of uncertainties in flood risk assessments
    Apel, Heiko
    Merz, Bruno
    Thieken, Annegret H.
    [J]. INTERNATIONAL JOURNAL OF RIVER BASIN MANAGEMENT, 2008, 6 (02) : 149 - 162
  • [7] Barendregt A., 2005, DWW2005005 RWS
  • [8] Inundation scenarios for flood damage evaluation in polder areas
    Bouwer, L. M.
    Bubeck, P.
    Wagtendonk, A. J.
    Aerts, J. C. J. H.
    [J]. NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2009, 9 (06) : 1995 - 2007
  • [9] BRIENE M, 2002, FINANCIELE ONDERBOUW, V1743, P1
  • [10] BRINKE WBM, 2004, RISICOS BEDIJKTE TER, P1