Load management in the Indian power sector using US experience

被引:15
作者
Banerjee, R [1 ]
机构
[1] Carnegie Mellon Univ, Dept Engn & Publ Policy, Pittsburgh, PA 15213 USA
关键词
D O I
10.1016/S0360-5442(98)00052-8
中图分类号
O414.1 [热力学];
学科分类号
摘要
India has a scarcity of electric power during peak-use periods, Most Indian utilities resort to load shedding (LS) to manage the peak demand. A review of US experience with direct load control and interruptible or time-of-use (TOU) tariffs shows successful programs. Direct load control of agricultural pumps, commercial air conditioners and interruptible or TOU tariffs in the industrial sector are identified as useful options for India. Implementation strategies for these are suggested. Load management (LM) by Indian utilities may provide a better solution to the current peak power shortage than mandatory LS. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:961 / 972
页数:12
相关论文
共 55 条
[41]  
RAJGOPALAN M, 1994, ENERG POLICY, V22, P89
[42]  
REED JH, 1990, AUTOMATING ELECT UTI, pCH6
[43]   TIME-OF-USE RATES FOR VERY LARGE CUSTOMERS ON THE PACIFIC GAS AND ELECTRIC COMPANY SYSTEM [J].
REYNOLDS, SP ;
CREIGHTON, TE .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1980, 99 (01) :147-151
[44]  
*SACR MUN UT RES P, 1992, 83 IRT TECHN INC RES
[45]  
SANT G, COMMUNICATION
[46]  
SARKAR A, 1997, EXAMPLES ACTION EXPE, P62
[47]  
SHEEN JN, 1995, IEE P-GENER TRANSM D, V142, P156
[48]  
STITT JR, 1988, INT LOAD MANAGEMENT, P91
[49]  
*TAT EN RES I, 1996, 95EM52 TAT EN RES I
[50]  
*TAT EN RES I, 1996, TAT EN DAT DIR TEDDY