Annual risk assessment for overload security

被引:45
作者
Dai, YJ [1 ]
McCalley, JD
Abi-Samra, N
Vittal, V
机构
[1] Iowa State Univ, Ames, IA 50011 USA
[2] Elect Power Res Inst, Palo Alto, CA USA
关键词
decision; overload security; planning; probabilistic risk; reliability; sequential trajectory;
D O I
10.1109/59.962405
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents an approach to assess the cumulative risk associated with overload security for the purposes of midterm power system planning. The work is motivated by a need to refine bulk pow er system reliability assessment to meet the needs of the restructured industry. There are two main contributions to the work. First, the assessment is performed over a year-long trajectory of hourly operating conditions, resulting in reliability assessment of all expected conditions and not just a limited number of snapshots. Secondly, the assessment is quantified by a risk index comprised of summed products of probability and consequence. This index is a good indicator of the actual reliability level, it is decomposable, and it can be effectively integrated into economic decision making paradigms. The work is illustrated using the 1996 IEEE Reliability Test System.
引用
收藏
页码:616 / 623
页数:8
相关论文
共 22 条
[1]  
ALLAN RN, 1983, IEE P C, V130, P165
[2]  
[Anonymous], P 1999 IEEE PES SUMM
[3]  
BORKOWSKA B, 1974, IEEE T POWER APPARAT, V93
[4]  
DAI Y, 1999 POW IND COMP AP
[5]  
DAI Y, 1997, N AM POW S OCT
[6]  
Dai Y., 1999, THESIS IOWA STATE U
[7]  
DAI Y, IN PRESS IEEE T POWE
[8]  
DAI Y, 1998, AM POW C APR
[9]  
DAI Y, 1998, N AM POW S OCT
[10]   PROBABILISTIC LOAD FLOW TECHNIQUES APPLIED TO POWER-SYSTEM EXPANSION PLANNING [J].
DASILVA, AML ;
RIBEIRO, SMP ;
ARIENTI, VL ;
ALLAN, RN ;
DOCOUTTO, MB .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (04) :1047-1053