High performance heuristic algorithm for controlling stochastic network projects

被引:5
作者
Golenko-Ginzburg, D [1 ]
Gonik, A
机构
[1] Ben Gurion Univ Negev, Dept Ind Engn & Management, IL-84105 Beer Sheva, Israel
[2] Luxembourg Ind, IL-89101 Arad, Israel
关键词
control action; inspection point; on-line control; network project; risk-averse decision making;
D O I
10.1016/S0925-5273(97)00149-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An activity-on-are network project of PERT type with random activity durations is considered. The progress of the project cannot be inspected and measured continuously, but only at preset inspection points. An on-line control model has to determine both inspection points and control actions to be introduced at those points to alter the progress of the project in the desired direction. On-line control is carried out to minimize the number of inspection points needed to meet the target, subject to the chance constraint. In the recently developed control models, determining the next inspection point is carried out via extensive simulation with a constant lime step. This determination is based on sequential statistical analysis at each intermediate point to maximize the time span between two adjacent control points. The main shortcoming of the control algorithm is its long computational time due to the need to make numerous decisions. In this paper we present a newly developed heuristic control algorithm in which the timing of inspection points does not comprise intermediate decision making. Given a routine inspection point t(i), the adjacent point t(i+1) is determined so that even if the project develops most unfavorably in the interval [t(i), t(i+1)], introducing proper control action at moment t(i+1), enables the project to meet its target on time, subject to the chance constraint. The newly developed control algorithm is essentially more efficient than the step-by-step control procedures. The computational time is reduced by a factor of 25-30 while the algorithm provides better solutions than would be attained by using on-line sequential statistical analysis. Extensive experimentation has been undertaken ro illustrate the comparative efficiency of the presented algorithm. (C) 1998 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:235 / 245
页数:11
相关论文
共 14 条
[1]   MANAGING PROJECT ACTIVITY DURATION UNCERTAINTIES [J].
ARSHAM, H .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1993, 21 (01) :111-122
[2]  
DIGMAN IA, 1981, RES MANAGE, V24, P10
[3]   THE LASTING QUALITIES OF PERT - PREFERENCES AND PERCEPTIONS OF R-AND-D PROJECT MANAGERS [J].
DOUGHERTY, DM ;
STEPHENS, DB ;
EZELL, DE .
R & D MANAGEMENT, 1984, 14 (01) :47-56
[4]  
ELMAGHRABYS, 1977, ACTIVITY NETWORKS PR
[5]   On-line control model for network construction projects [J].
GolenkoGinzburg, D ;
Gonik, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1997, 48 (02) :175-183
[6]   CONTROLLED ALTERNATIVE ACTIVITY NETWORKS FOR PROJECT-MANAGEMENT [J].
GOLENKOGINZBURG, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) :336-346
[7]  
GOLENKOGINZBURG D, 1990, J OPER RES SOC, V41, P1021, DOI 10.1057/jors.1990.160
[8]   A 2-LEVEL DECISION-MAKING MODEL FOR CONTROLLING STOCHASTIC PROJECTS [J].
GOLENKOGINZBURG, D .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (01) :117-127
[9]   On-line control model for cost-simulation network projects [J].
GolenkoGinzburg, D ;
Gonik, A .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1996, 47 (02) :266-283
[10]   PRODUCTION CONTROL WITH VARIABLE SPEEDS AND INSPECTION POINTS [J].
GOLENKOGINZBURG, DI ;
SINUANYSTERN, Z .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :629-636