Performance measurement model for Turkish aviation firms using the rough-AHP and TOPSIS methods under fuzzy environment

被引:97
作者
Aydogan, Emel Kizilkaya [1 ]
机构
[1] Erciyes Univ, Fac Engn, Dept Ind Engn, Kayseri, Turkey
关键词
Rough set; AHP; Fuzzy TOPSIS; Performance measurement; Decision making; DECISION-MAKING; MULTIPLE CRITERIA; ROBOT SELECTION;
D O I
10.1016/j.eswa.2010.09.060
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In today's organizations, performance measurement comes more to the foreground with the advancement in the high technology. So as to manage this power, which is an important element of the organizations, it is needed to have a performance measurement system. Increased level of competition in the business environment and higher customer requirements forced industry to establish a new philosophy to measure its performance beyond the existing financial and non-financial based performance indicators. In this paper, a conceptual performance measurement framework that takes into account company-level factors is presented for a real world application problem. In order to use the conceptual framework for measuring performance, a methodology that takes into account both quantitative and qualitative factors and the interrelations between them should be utilized. For this reason, an integrated approach of analytic hierarchy process (AHP) improved by rough sets theory (Rough-AHP) and fuzzy TOPSIS method is proposed to obtain final ranking. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3992 / 3998
页数:7
相关论文
共 41 条
[1]   Using analytic hierarchy process (AHP) to improve human performance: An application of multiple criteria decision making problem [J].
Albayrak, E ;
Erensal, YC .
JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (04) :491-503
[2]  
Amaratunga D., 2000, P COBRA GREENW UK
[3]  
[Anonymous], 1985, INT J APPROXIMATE RE
[4]  
[Anonymous], J INFORM OPTIM SCI
[5]   Performance measurement in construction [J].
Bassioni, HA ;
Price, ADF ;
Hassan, TM .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2004, 20 (02) :42-50
[6]  
Bourne M., 2003, MEASURING BUSINESS E, V7, P3
[7]   FUZZY HIERARCHICAL ANALYSIS [J].
BUCKLEY, JJ .
FUZZY SETS AND SYSTEMS, 1985, 17 (03) :233-247
[8]   Global supplier development considering risk factors using fuzzy extended AHP-based approach [J].
Chan, Felix T. S. ;
Kumar, Niraj .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (04) :417-431
[9]   Extensions of the TOPSIS for group decision-making under fuzzy environment [J].
Chen, CT .
FUZZY SETS AND SYSTEMS, 2000, 114 (01) :1-9
[10]   A fuzzy TOPSIS method for robot selection [J].
Chu, TC ;
Lin, YC .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 21 (04) :284-290