Active Distribution Network Integrated Planning Incorporating Distributed Generation and Load Response Uncertainties

被引:338
作者
Martins, Vinicius F. [1 ]
Borges, Carmen L. T. [2 ]
机构
[1] EPE Brazilian Energy Res Co, BR-20050002 Rio De Janeiro, Brazil
[2] Univ Fed Rio de Janeiro, Dept Elect Engn, BR-21941972 Rio De Janeiro, Brazil
关键词
Active distribution network; distributed generation; expansion planning; genetic algorithms; load response; uncertainty representation; DISTRIBUTION-SYSTEMS; RELIABILITY;
D O I
10.1109/TPWRS.2011.2122347
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
This paper presents a model for active distribution systems expansion planning based on genetic algorithms, where distributed generation (DG) integration is considered together with conventional alternatives for expansion, such as rewiring, network reconfiguration, installation of new protection devices, etc. The novel approach of planning DG integration together with network expansion is a requirement for the modern active distribution network. However, the uncertainties related to DG power generation and load response growth must be taken into account in order to plan a safe system at a minimum cost. Thus, two different methodologies for uncertainties incorporation through the use of multiple scenarios analysis are proposed and compared. The multiple objectives optimization algorithm applied in the model takes into account the costs of reliability, losses, power imported from transmission, and network investments.
引用
收藏
页码:2164 / 2172
页数:9
相关论文
共 12 条
[1]
[Anonymous], 2009, Microgrids and Active Distribution Networks
[2]
NETWORK RECONFIGURATION IN DISTRIBUTION-SYSTEMS FOR LOSS REDUCTION AND LOAD BALANCING [J].
BARAN, ME ;
WU, FF .
IEEE TRANSACTIONS ON POWER DELIVERY, 1989, 4 (02) :1401-1407
[3]
Optimal distributed generation allocation for reliability, losses, and voltage improvement [J].
Borges, Carmen L. T. ;
Falcao, Djalma M. .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2006, 28 (06) :413-420
[4]
Calderaro V., 2004, BULK POWER SYSTEM DY, P375
[5]
Carpinelli G., 2001, IEEE T POWER SYST, V20, P750
[6]
A multiobjective evolutionary algorithm for the sizing and siting of distributed generation [J].
Celli, G ;
Ghiani, E ;
Mocci, S ;
Pilo, F .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :750-757
[7]
ELECTRICAL-POWER DISTRIBUTION-SYSTEMS PLANNING USING FUZZY MATHEMATICAL-PROGRAMMING [J].
KAGAN, N ;
ADAMS, RN .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 1994, 16 (03) :191-196
[8]
Kim K. H., 2002, P IEEE POW ENG SOC S, V13, P1148
[9]
Probabilistic wind farms generation model for reliability studies applied to Brazilian sites [J].
Leite, Andrea P. ;
Borges, Carmen L. T. ;
Falcao, Djalma M. .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (04) :1493-1501
[10]
Martins V. F., 2003, THESIS FEDERAL U JUI