Application of a generic bow-tie based risk analysis framework on risk management of sea ports and offshore terminals

被引:120
作者
Mokhtari, Kambiz [1 ]
Ren, Jun [1 ]
Roberts, Charles [1 ]
Wang, Jin [1 ]
机构
[1] Liverpool John Moores Univ, Liverpool Logist Offshore & Marine LOOM Res Inst, Sch Engn Technol & Maritime Operat, Liverpool L3 5UX, Merseyside, England
关键词
Bow-tie framework; Risk management (RM); Sea ports and offshore terminals operations and management (PTOM); Fuzzy Set Theory (FST); Fuzzy Possibility Score (FPS); FAULT-TREE ANALYSIS; DECISION-MAKING; FUZZY; METHODOLOGY; TOPSIS;
D O I
10.1016/j.jhazmat.2011.05.035
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Ports and offshore terminals are critical infrastructure resources and play key roles in the transportation of goods and people. With more than 80 percent of international trade by volume being carried out by sea, ports and offshore terminals are vital for seaborne trade and international commerce. Furthermore in today's uncertain and complex environment there is a need to analyse the participated risk factors in order to prioritise protective measures in these critically logistics infrastructures. As a result of this study is carried out to support the risk assessment phase of the proposed Risk Management (RM) framework used for the purpose of sea ports and offshore terminals operations and management (PTOM). This has been fulfilled by integration of a generic bow-tie based risk analysis framework into the risk assessment phase as a backbone of the phase. For this reason Fault Tree Analysis (FTA) and Event Tree Analysis (ETA) are used to analyse the risk factors associated within the PTOM. This process will eventually help the port professionals and port risk managers to investigate the identified risk factors more in detail. In order to deal with vagueness of the data Fuzzy Set Theory (FST) and possibility approach are used to overcome the disadvantages of the conventional probability based approaches. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:465 / 475
页数:11
相关论文
共 71 条
[31]  
Druschel R.B., 2006, CMWR, P31
[32]  
Edwards C.J., 1999, P 2 ANN 2 DAY C AV S
[33]  
Ertugrul D., 2007, EXPERT SYSTEMS APPL, V36, P702
[34]   Handling data uncertainties in event tree analysis [J].
Ferdous, Refaul ;
Khan, Faisal ;
Sadiq, Rehan ;
Amyotte, Paul ;
Veitch, Brian .
PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2009, 87 (05) :283-292
[35]  
GAO United States Government Accountability Office, 2006, PORT RISK MAN FURT R
[36]  
Groeneweg J., 1998, CONTROLLING CONTROLL
[37]  
Henley J., 1981, RELIABILITY ENG RISK
[38]  
Hoyland A., 1994, Systems reliability theory
[39]  
HSE, 2010, FEAS STOR SOFTW TOOL
[40]   UNCERTAINTY ANALYSIS OF SYSTEM RELIABILITY AND AVAILABILITY ASSESSMENT [J].
JACKSON, PS ;
HOCKENBURY, RW ;
YEATER, ML .
NUCLEAR ENGINEERING AND DESIGN, 1982, 68 (01) :5-29