Investigating the impact of embedded generation on relay settings of utilities' electrical feeders

被引:44
作者
Salman, SK [1 ]
Rida, IM [1 ]
机构
[1] Robert Gordon Univ, Sch Elect & Elect Engn, Aberdeen AB10 1FR, Scotland
关键词
critical clearing time; distribution networks; embedded generation; EMTP; protection; simulation;
D O I
10.1109/61.915490
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Since the late 70s intensive efforts have been made to utilize renewable energy sources to generate electric poser. On the other hand economical pressure experienced in recent years has led to the development of high efficiency combined heat and po,Fer schemes to use the normally wasted heat to generate electric poser. generators used under both schemes can be either synchronous or asynchronous types and when they are integrated into utilities' distribution networks (DSs) they are commonly known as "embedded generators (EGs)." Previous experience has shown that the integration of EGs into DNs could create safety and technical problems. They may contribute to fault currents, cause voltage flickers, interfere with the process of voltage control, etc. This paper reports an investigation to determine the impact of the integration of EGs on the settings of protective de,ices of electrical feeders emanated from the substation to which EGs are connected. This study also covers the dynamic behavior of EG caused by disturbances on the host network. Results obtained from several case studies presented and discussed.
引用
收藏
页码:246 / 251
页数:6
相关论文
共 14 条
[11]  
ROGERS WJS, 1991, IEE C PAR OP GEN PLA, P1
[12]  
SALMAN SK, 1997, INT C EXH PROT EL NE
[13]  
SALMAN SK, 1993, ATHENS POWER TECH IE, P591
[14]  
SARMA MS, 1985, ELECT MACHINES STEAD