Planning for big things in Brazil

被引:19
作者
Barroso, Luiz A.
Porrua, Fernando
Thome, Luiz M.
Pereira, Mario V.
机构
来源
IEEE POWER & ENERGY MAGAZINE | 2007年 / 5卷 / 05期
关键词
D O I
10.1109/MPE.2007.904763
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 [电气工程]; 0809 [电子科学与技术];
摘要
Planning and building large-scale transmission networks in competitive hydrothermal systems in Brazil is presented. The economic evaluation of new generation projects has to take into account an estimate of the associated transmission charges. The business model for transmission expansion in Brazil relies on a combination of planning and competition. The model is to be successful both in terms of ensuring expansion and attracting private investments and is being considered by other Latin American countries, mainly Central America and the Andean market. The interchange capacity limits in between regional systems have increased due to new transmission facilities, avoiding congestion risks, enhancing the system security margins, and giving more transmission capacity to accommodate the needed power flows to optimize the hydrothermal dispatch.
引用
收藏
页码:54 / 63
页数:10
相关论文
共 6 条
[1]
BARROSO LA, 2006, P 2006 IEEE PES GEN, P18
[2]
BARROSO LA, 2004, 2004 IEEE PES GEN M
[3]
Classification of publications and models on transmission expansion planning [J].
Latorre, G ;
Cruz, RD ;
Areiza, JM ;
Villegas, A .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (02) :938-946
[4]
Reference transmission network: A game theory approach [J].
Minoia, A ;
Ernst, D ;
Dicorato, M ;
Trovato, M ;
Ilic, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (01) :249-259
[5]
South American reform lessons [J].
2005, Institute of Electrical and Electronics Engineers Inc. (03) :49-59
[6]
Shahidehpour M., 2004, IEEE Power & Energy Magazine, V2, P14, DOI 10.1109/MPAE.2004.1263412