In many situations, a worker's ability improves as a result of repeating the same or similar tasks; this phenomenon is known as the "learning effect". In this paper, the learning effect is considered in a two-machine flowshop. The objective is to find a sequence that minimizes the total completion time. Several dominance properties and the lower bounds are derived to speed up the elimination process of the branch-and-bound algorithm. A heuristic algorithm is also proposed to overcome the inefficiency of the branch-and-bound algorithm. In the simulation, the proposed heuristic algorithm is shown to perform consistently better than the previous one. (C) 2003 Elsevier B.V. All rights reserved.
引用
收藏
页码:85 / 93
页数:9
相关论文
共 17 条
[1]   New heuristics to minimize total completion time in m-machine flowshops [J].
Allahverdi, A ;
Aldowaisan, T .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 77 (01) :71-83
[2]   Single-machine scheduling with learning considerations [J].
Biskup, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (01) :173-178
[3]  
Cadambi B. V., 1993, Opsearch, V30, P35
[4]   A branch and bound algorithm to minimize the total flow time for m-machine permutation flowshop problems [J].
Chung, CS ;
Flynn, J ;
Kirca, O .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (03) :185-196
[5]  
CROCE FD, 1996, EUR J OPER RES, V90, P227
[6]   An improved branch-and-bound algorithm for the two machine total completion time flow shop problem [J].
Della Croce, F ;
Ghirardi, M ;
Tadei, R .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (02) :293-301
[7]   FLOW-SHOP AND JOB-SHOP SCHEDULES - COMPLEXITY AND APPROXIMATION [J].
GONZALEZ, T ;
SAHNI, S .
OPERATIONS RESEARCH, 1978, 26 (01) :36-52
[8]   Minimizing total completion time in a two-machine flowshop: Analysis of special cases [J].
Hoogeveen, JA ;
Kawaguchi, T .
MATHEMATICS OF OPERATIONS RESEARCH, 1999, 24 (04) :887-910
[9]   APPLICATION OF BRANCH AND BOUND TECHNIQUE TO SOME FLOW-SHOP SCHEDULING PROBLEMS [J].
IGNALL, E ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1965, 13 (03) :400-&
[10]   EXACT, APPROXIMATE, AND GUARANTEED ACCURACY ALGORITHMS FOR FLOW-SHOP PROBLEM N-2-F-BARF [J].
KOHLER, WH ;
STEIGLITZ, K .
JOURNAL OF THE ACM, 1975, 22 (01) :106-114