Factors affecting the success of a construction project

被引:465
作者
Chan, APC [1 ]
Scott, D
Chan, APL
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon, Hong Kong, Peoples R China
[2] Curtin Univ Technol, Perth, WA 6845, Australia
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2004年 / 130卷 / 01期
关键词
D O I
10.1061/(ASCE)0733-9364(2004)130:1(153)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Different researchers have tried to determine the factors for a successful project for a long time. Lists of variables have been abounded in the literature, however, no general agreement can be made. The aim of this paper is to develop a conceptual framework on critical success factors (CSFs). Seven major journals in the construction field are chosen to review the previous works on project success. Five major groups of independent variables, namely project-related factors, project procedures, project management actions, human-related factors, and external environment are identified as crucial to project success. Further study on the key performance indicators (KPIs) is needed to identify the causal relationships between CSFs and KPIs. The causal relationships, once identified, will be a useful piece of information to implement a project successfully.
引用
收藏
页码:153 / 155
页数:3
相关论文
共 21 条
[1]  
Akinsola A. O., 1997, INT J PROJ MANAG, V15, P263, DOI DOI 10.1016/S0263-7863(96)00081-6
[2]  
[Anonymous], CONSTR MANAG EC, DOI DOI 10.1080/014461997372953
[3]  
Belassi W., 1996, INT J PROJ MANAG, V14, P141
[4]  
Belout A., 1998, Int. J. Proj. Manag., V16, P21, DOI [DOI 10.1016/50263-7863(97)00011-2, 10.1016/S0263-7863(97)00011-2, DOI 10.1016/S0263-7863(97)00011-2]
[5]   Framework of success criteria for design/build projects [J].
Chan, APC ;
Scott, D ;
Lam, EWM .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (03) :120-128
[6]  
Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
[7]   Critical success factors for different project objectives [J].
Chua, DKH ;
Kog, YC ;
Loh, PK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03) :142-150
[8]  
Dissanayaka S.M., 1999, Engineering, Construction and Architectural Management, V6, P287, DOI [10.1108/eb021119, DOI 10.1108/EB021119]
[9]  
HASSAN AQ, 1995, J MANAGE ENG, V11, P22
[10]  
Hubbard D., 1990, PROJ MANAG J, V11, P19