Whose uncertainty assessments (probability distributions) does a risk assessment report: the analysts' or the experts'?

被引:25
作者
Aven, Terje [2 ]
Guikema, Seth [1 ]
机构
[1] Johns Hopkins Univ, Baltimore, MD 21218 USA
[2] Univ Stavanger, Stavanger, Norway
基金
美国国家科学基金会;
关键词
Uncertainty; Elicitation; Epistemic; Risk assessment; Experts; VARIABILITY;
D O I
10.1016/j.ress.2011.05.001
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It is often said that the aim of risk assessment is to faithfully represent and report the knowledge of some defined experts in the field studied. The analysts' job is to elicit this knowledge, synthesise it and report the results as integrated uncertainty assessments, for example, expressed through a set of probability distributions. Analysts' judgements beyond these tasks should not be incorporated in the uncertainty assessments (distributions). The purpose of the present paper is to discuss the rationale of this perspective. To conduct a risk assessment in practice the analysts need to make a number of judgements related to, for example, the choice of methods and models that to a large extent influence the results. And often the analysts are the real experts on many of the issues addressed in the assessments, in particular, when it comes to understanding how various phenomena and processes interact. Would it then not be more appropriate to fully acknowledge the role of the analysts as uncertainty assessors and probability assigners, and see the results of the risk assessments as their judgements based on input from the experts? The discussion is illustrated by two examples. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1257 / 1262
页数:6
相关论文
共 31 条
[1]  
[Anonymous], 1988, POSSIBILITY THEORY
[2]  
[Anonymous], 2010, Introduction to Probability Models
[3]  
[Anonymous], 2001, Making hard decisions with decision tools
[4]   How useful is quantitative risk assessment? [J].
Apostolakis, GE .
RISK ANALYSIS, 2004, 24 (03) :515-520
[5]   Barrier and operational risk analysis of hydrocarbon releases (BORA-Release) Part I. Method description [J].
Aven, Terje ;
Sklet, Snorre ;
Vinnem, Jan Erik .
JOURNAL OF HAZARDOUS MATERIALS, 2006, 137 (02) :681-691
[6]   Some considerations on the treatment of uncertainties in risk assessment for practical decision making [J].
Aven, Terje ;
Zio, Enrico .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (01) :64-74
[7]   Reply to Discussants on "The Need for Restricting the Probabilistic Analysis in Risk Assessments to Variability" [J].
Aven, Terje .
RISK ANALYSIS, 2010, 30 (03) :381-384
[8]  
Barlow R.E., 1998, Engineering Reliability
[9]  
Berger J. O., 1994, Test, V3, P5, DOI 10.1007/BF02562676
[10]  
Budnitz RJ, 1997, NUREGCR6372 NUCL REG, V1