A new pumping-probing scheme for the optically pumped cesium beam frequency standard

被引:9
作者
Chen, JB [1 ]
Zhu, CJ [1 ]
Wang, FZ [1 ]
Yang, DH [1 ]
Wang, YQ [1 ]
机构
[1] Peking Univ, Dept Elect, Beijing 100871, Peoples R China
来源
CHINESE PHYSICS LETTERS | 2001年 / 18卷 / 01期
关键词
Cesium;
D O I
10.1088/0256-307X/18/1/306
中图分类号
O4 [物理学];
学科分类号
0702 ;
摘要
A new pumping-probing scheme for the optically pumped cesium beam frequency standard has been experimentally tested in our laboratory The stability of the optically pumped cesium beam frequency standard was measured by comparing its 10 MHz output with an HP5071A commercial cesium atomic clock. The result shows that the frequency stability for the 1s and 30000s sample times are 1.2 x 10(-11) and 3.7 x 10(-13), respectively. It was proved that the new pumping scheme works well.
引用
收藏
页码:16 / 17
页数:2
相关论文
共 11 条
[11]  
[No title captured]