A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction

被引:473
作者
Fang, Kan [3 ]
Uhan, Nelson [3 ]
Zhao, Fu [1 ,2 ]
Sutherland, John W. [1 ,2 ]
机构
[1] Purdue Univ, Sch Mech Engn, W Lafayette, IN 47907 USA
[2] Purdue Univ, Div Environm & Ecol Engn, W Lafayette, IN 47907 USA
[3] Purdue Univ, Sch Ind Engn, W Lafayette, IN 47907 USA
关键词
Scheduling; Peak load; Carbon footprint; Makespan; ENERGY-CONSUMPTION; SYSTEMS; SHOP;
D O I
10.1016/j.jmsy.2011.08.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Manufacturing scheduling strategies have historically emphasized cycle time; in almost all cases, energy and environmental factors have not been considered in scheduling. This paper presents a new mathematical programming model of the flow shop scheduling problem that considers peak power load, energy consumption, and associated carbon footprint in addition to cycle time. The new model is demonstrated using a simple case study: a flow shop where two machines are employed to produce a variety of parts. In addition to the processing order of the jobs, the proposed scheduling problem considers the operation speed as an independent variable, which can be changed to affect the peak load and energy consumption. Even with a single objective, finding an optimal schedule is notoriously difficult, so directly applying commercial software to this multi-objective scheduling problem requires significant computation time. This paper calls for the development of more specialized algorithms for this new scheduling problem and examines computationally tractable approaches for finding near-optimal schedules. (C) 2011 The Society of Manufacturing Engineers. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:234 / 240
页数:7
相关论文
共 36 条
[1]   Framework for the dynamic scheduling of complex job shops [J].
Aálvarez, Esther ;
Diáaz, Fernando .
International Journal of Manufacturing Technology and Management, 2007, 11 (3-4) :411-425
[2]  
[Anonymous], P 2009 ASME MAN SCI
[3]  
[Anonymous], US CARB DIOX EM EN S
[4]  
[Anonymous], DOEEIA03842009
[5]  
Dahmus J.B., 2004, ASME INT MECH ENG C
[6]  
Demidenko VM, 1979, IZV AKAD NAUK BS FMN, V1, P29
[7]  
Diarra D.C., 2010, Transaction of North America Manufacturing Research Institution of SME, V38, P767
[8]  
Dornfeld D.A., 2007, Transactions of the North American Manufacturing Research Institute of SME, V35, P193
[9]  
Drake R, 2006, IIE ANN C EXP
[10]   Algorithms for the car sequencing and the level scheduling problem [J].
Drexl, A ;
Kimms, A ;
Matthiessen, L .
JOURNAL OF SCHEDULING, 2006, 9 (02) :153-176