A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems

被引:212
作者
Jarboui, B. [2 ]
Damak, N. [2 ]
Siarry, P. [1 ]
Rebai, A. [3 ]
机构
[1] Univ Paris 12, LiSSi, F-94010 Creteil, France
[2] FSEGS, Sfax 3018, Tunisia
[3] ISAAS, Sfax 3018, Tunisia
关键词
combinatorial optimization; combinatorial particle swarm optimization; multi-mode resource-constrained project scheduling problem; local search;
D O I
10.1016/j.amc.2007.04.096
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
The particle swarm optimization (PSO) has been widely used to solve continuous problems. The discrete problems have just begun to be also solved by the discrete PSO. However, the combinatorial problems remain a prohibitive area to the PSO mainly in case of integer values. In this paper, we propose a combinatorial PSO (CPSO) algorithm that we take up challenge to use in order to solve a multi-mode resource-constrained project scheduling problem (MRCPSP). The results that have been obtained using a standard set of instances, after extensive experiments, prove to be very competitive in terms of number of problems solved to optimality. By comparing average deviations and percentages of optima found, our CPSO algorithm outperforms the simulated annealing algorithm and it is close to the PSO algorithm. (C) 2007 Elsevier Inc. All rights reserved.
引用
收藏
页码:299 / 308
页数:10
相关论文
共 19 条
[1]  
[Anonymous], 1995, 1995 IEEE INT C
[2]   A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes [J].
Boctor, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :349-361
[3]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[4]  
BOULEIMEN K, 1998, P 6 INT WORKSH PROJ, P19
[5]   NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DREXL, A ;
GRUENEWALD, J .
IIE TRANSACTIONS, 1993, 25 (05) :74-81
[6]  
Elmaghraby S.E., 1977, Activity Networks: Project Planning and Control by Network Models
[7]  
Hartmann S, 1998, NETWORKS, V32, P283, DOI 10.1002/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO
[8]  
2-I
[9]   Characterization and generation of a general class of resource-constrained project scheduling problems [J].
Kolisch, R ;
Sprecher, A ;
Drexl, A .
MANAGEMENT SCIENCE, 1995, 41 (10) :1693-1703
[10]  
Kolisch R, 1997, IIE TRANS, V29, P987