A new heuristic and dominance relations for no-wait flowshops with setups

被引:46
作者
Aldowaisan, T [1 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Mech & Ind Engn, Safat, Kuwait
关键词
two-machine flowshop; sequence-independent setup time; no-wait; total flowtime;
D O I
10.1016/S0305-0548(99)00136-7
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The two-machine no-wait flowshop problem, where setup times are considered separate from processing times and sequence independent, is addressed with respect to minimizing total flowtime. A local and a global dominance relation are developed and a new heuristic is provided. Furthermore, a lower bound is obtained and used along with the dominance relations in a branch-and-bound algorithm in order to evaluate the efficiency of the heuristic. Computational experience demonstrates the superiority of the local dominance relation and the new heuristic.
引用
收藏
页码:563 / 584
页数:22
相关论文
共 21 条
[1]   FLOWSHOP NO-IDLE OR NO-WAIT SCHEDULING TO MINIMIZE THE SUM OF COMPLETION TIMES [J].
ADIRI, I ;
POHORYLES, D .
NAVAL RESEARCH LOGISTICS, 1982, 29 (03) :495-504
[2]   Total flowtime in no-wait flowshops with separated setup times [J].
Aldowaisan, T ;
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (09) :757-765
[3]   Scheduling in stochastic flowshops with independent setup, processing and removal times [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (10) :955-960
[4]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[5]   Job lateness in flowshops with setup and removal times separated [J].
Allahverdi, A ;
Aldowaisan, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (09) :1001-1006
[6]  
ALLAHVERDI A, 1995, J OPER RES SOC, V46, P896, DOI 10.2307/2583973
[7]  
Bagga P. C., 1986, INDIAN J MANAGEMENT, V2
[8]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[9]   EVALUATION OF FLOW SHOP SEQUENCING HEURISTICS [J].
DANNENBRING, DG .
MANAGEMENT SCIENCE, 1977, 23 (11) :1174-1182
[10]   JOB LATENESS IN A 2-MACHINE FLOWSHOP WITH SETUP TIMES SEPARATED [J].
DILEEPAN, P ;
SEN, T .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (06) :549-556