Job lateness in flowshops with setup and removal times separated

被引:14
作者
Allahverdi, A [1 ]
Aldowaisan, T [1 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Mech & Ind Engn, Safat, Kuwait
关键词
two-machine flowshop; ordered flowshop; setup time; removal time; maximum lateness;
D O I
10.1038/sj.jors.2600583
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper addresses the two-machine flowshop problem where the setup, processing, and removal times of the jobs are separated and are independent of the job sequence. This problem is considered with maximum lateness as a measure of performance. Elimination criteria are established for both the classical and ordered flowshops, and optimal sequences are obtained for special ordered flowshops.
引用
收藏
页码:1001 / 1006
页数:6
相关论文
共 20 条
[1]   Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (10) :909-916
[2]  
ALLAHVERDI A, 1995, J OPER RES SOC, V46, P896, DOI 10.2307/2583973
[3]   2-MACHINE ORDERED FLOWSHOP SCHEDULING UNDER RANDOM BREAKDOWNS [J].
ALLAHVERDI, A ;
MITTENTHAL, J .
MATHEMATICAL AND COMPUTER MODELLING, 1994, 20 (02) :9-17
[4]   SCHEDULING ON A 2-MACHINE FLOWSHOP SUBJECT TO RANDOM BREAKDOWNS WITH A MAKESPAN OBJECTIVE FUNCTION [J].
ALLAHVERDI, A ;
MITTENTHAL, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :376-387
[5]  
ALLAHVERDI A, 1994, T OPL RES, V6, P47
[6]  
DANIELS RL, 1990, NAV RES LOG, V37, P981, DOI 10.1002/1520-6750(199012)37:6<981::AID-NAV3220370617>3.0.CO
[7]  
2-H
[8]   JOB LATENESS IN A 2-MACHINE FLOWSHOP WITH SETUP TIMES SEPARATED [J].
DILEEPAN, P ;
SEN, T .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (06) :549-556
[9]   STOCHASTICALLY MINIMIZING THE MAKESPAN IN FLOW SHOPS [J].
FOLEY, RD ;
SURESH, S .
NAVAL RESEARCH LOGISTICS, 1984, 31 (04) :551-557
[10]  
Grabowski J., 1980, Opsearch, V17, P133