Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness

被引:38
作者
Allahverdi, A
机构
[1] Industrial and Systems Engineering, Dept. of Mech. and Indust. Eng., Kuwait University, Safat 13060
关键词
D O I
10.1016/0305-0548(96)00012-3
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses the problem of scheduling in a two-machine proportionate flowshop with a maximum lateness objective function, where machines are subject to random breakdowns. It is shown that, under appropriate conditions, the Longest Processing Time policy minimizes the objective function with probability 1 if only the first machine is subject to breakdowns. It is also shown that when only the second machine suffers breakdowns, the Shortest Processing Time policy minimizes the objective function with probability 1. Copyright (C) 1996 Elsevier Science Ltd.
引用
收藏
页码:909 / 916
页数:8
相关论文
共 20 条
[1]  
ALLAHVERDI A, 1995, J OPER RES SOC, V46, P896, DOI 10.2307/2583973
[2]   2-MACHINE ORDERED FLOWSHOP SCHEDULING UNDER RANDOM BREAKDOWNS [J].
ALLAHVERDI, A ;
MITTENTHAL, J .
MATHEMATICAL AND COMPUTER MODELLING, 1994, 20 (02) :9-17
[3]   SCHEDULING ON A 2-MACHINE FLOWSHOP SUBJECT TO RANDOM BREAKDOWNS WITH A MAKESPAN OBJECTIVE FUNCTION [J].
ALLAHVERDI, A ;
MITTENTHAL, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 81 (02) :376-387
[4]  
ALLAHVERDI A, 1994, T OPL RES, V6, P47
[5]  
Baker KR., 1974, Introduction to Sequencing and Scheduling
[6]  
BIRGE J, 1990, NAV RES LOG, V37, P661, DOI 10.1002/1520-6750(199010)37:5<661::AID-NAV3220370506>3.0.CO
[7]  
2-3
[8]   JOB LATENESS IN A 2-MACHINE FLOWSHOP WITH SETUP TIMES SEPARATED [J].
DILEEPAN, P ;
SEN, T .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (06) :549-556
[9]  
DU C, 1995, NAV RES LOG, V42, P1251, DOI 10.1002/1520-6750(199512)42:8<1251::AID-NAV3220420809>3.0.CO
[10]  
2-Q