共 60 条
[1]
Alchian A., 1977, Economic Forces at Work
[2]
[Anonymous], ENG DESIGN RELIABILI
[3]
Robust reliability of projects with activity-duration uncertainty
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1998, 124 (02)
:125-132
[4]
Ben-Halm Y., 2001, SERIES DECISION RISK
[5]
BENHAIM Y, 2003, 200335 FED RES BANK
[6]
BENHAIM Y, 1996, ROBUST RELIABILITY M
[7]
BEST LS, 1982, EVOLUTION, V36, P70, DOI [10.2307/2407968, 10.1111/j.1558-5646.1982.tb05011.x]
[10]
OPTIMAL FORAGING, MARGINAL VALUE THEOREM
[J].
THEORETICAL POPULATION BIOLOGY,
1976, 9 (02)
:129-136