Scheduling of design projects with uncertain number of iterations

被引:67
作者
Luh, PB
Liu, F [1 ]
Moser, B
机构
[1] Univ Connecticut, Dept Elect & Syst Engn, Storrs, CT 06269 USA
[2] Univ Tokyo, United Technol Res Ctr, Tokyo, Japan
基金
美国国家科学基金会;
关键词
scheduling theory; design project management; integer programming; stochastic dynamic programming; risk management;
D O I
10.1016/S0377-2217(98)00027-7
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A short product design cycle is critical to the success of companies in the era of time-based competition. The underlying design activities, however, are often interlinked and quite uncertain. For example, some activities may have to be iterated several times to meet the design criteria. Furthermore, time-critical projects suffer the risk of failure if they cannot meet established target dates. Generating good and robust schedules is thus critical, especially under the concurrent engineering paradigm where the delay of a single task may have a domino effect on subsequent tasks and on other projects sharing designers and/or resources. This paper studies the scheduling of design projects with uncertain number of iterations while managing design risks. A "separable" problem formulation that balances modeling accuracy and computation complexity is created with the goal to minimize project tardiness and risk penalties. An optimization-based methodology that combines Lagrangian relaxation, stochastic dynamic programming, and "ordinal optimization" is developed. Numerical results supported by simulation demonstrate that near optimal solutions are obtained, and uncertainties are effectively managed for problems of practical sizes. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:575 / 592
页数:18
相关论文
共 31 条
[1]  
BARSHALOM Y, 1993, ESTIMATION TRACKING, P75
[2]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[3]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13
[4]  
Chen CH, 1995, PROCEEDINGS OF THE 34TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, P2598, DOI 10.1109/CDC.1995.478499
[5]  
CHEN HX, 1995, IEEE INT CONF ROBOT, P496, DOI 10.1109/ROBOT.1995.525332
[6]   PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH [J].
CHRISTOFIDES, N ;
ALVAREZVALDES, R ;
TAMARIT, JM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) :262-273
[7]  
Cooper D.F., 1987, RISK ANAL LARGE PROJ
[8]   SCHEDULING PRODUCTS WITH BILLS OF MATERIALS USING AN IMPROVED LAGRANGIAN-RELAXATION TECHNIQUE [J].
CZERWINSKI, CS ;
LUH, PB .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1994, 10 (02) :99-111
[9]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[10]  
DEMEULEMEESTER E, 1996, EUR J OPER RES, V90, P18903