A case-based decision support tool for bid mark-up estimation of international construction projects

被引:82
作者
Dikmen, Irem [1 ]
Birgonul, M. Talat [1 ]
Gur, A. Kemal [1 ]
机构
[1] Middle E Tech Univ, Dept Civil Engn, TR-06531 Ankara, Turkey
关键词
case-based reasoning; bidding; mark-up;
D O I
10.1016/j.autcon.2007.02.009
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The bid mark-up estimation is an unstructured decision problem that is usually solved by intuition. The aim of this paper is to present a decision support tool so that bid mark-up values may be estimated in a more systematic way. For this purpose, various factors that may affect the level of risk, opportunity and competition in a project option have been identified. Using the 95 cases obtained from the Turkish contractors working in international markets, a case-based reasoning model (CBR) has been developed to estimate the risk, opportunity and competition ratings. These ratings are further converted to risk and profit mark-up values by using linear utility functions constructed according to the boundary values which were identified by the respondents considering worst, average and best scenarios. The applicability of the model has been demonstrated on a real case study. (C) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:30 / 44
页数:15
相关论文
共 22 条
  • [1] *AACE INT, 2003, SKILLS KNOWL COST EN
  • [2] DECISION-SUPPORT SYSTEM FOR MODELING BID NO-BID DECISION PROBLEM
    AHMAD, I
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (04): : 595 - 608
  • [3] Best R.J., 1997, MARKET BASED MANAGEM
  • [4] Key factors in bid reasoning model
    Chua, DKH
    Li, D
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (05): : 349 - 357
  • [5] Impacts of obstacles in East Asian cross-border construction
    Chua, DKH
    Wang, Y
    Tan, WT
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2003, 129 (02) : 131 - 141
  • [6] Case-based reasoning approach in bid decision making
    Chua, DKH
    Li, DZ
    Chan, WT
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (01): : 35 - 45
  • [7] DOZZI SP, 1996, ASCE J CONSTRUCTION, V122, P199
  • [8] Dulaimi M. F., 2002, CONSTRUCTION MANAGEM, V20, P601, DOI DOI 10.1080/01446190210159890
  • [9] DUPREE C, 2001, HARVARD MAGAZINE SEP
  • [10] HAWKINS J, 2004, INTELLIGENCE HENRY H