No-wait flow shop scheduling using fuzzy multi-objective linear programming

被引:23
作者
Javadi, Babak [1 ]
Saidi-Mehrabad, M. [2 ]
Haji, Alireza [3 ]
Mahdavi, Iraj [1 ]
Jolai, F. [4 ]
Mahdavi-Amiri, N. [5 ]
机构
[1] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
[2] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[3] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
[4] Univ Tehran, Dept Ind Engn, Fac Engn, Tehran, Iran
[5] Sharif Univ Technol, Dept Math Sci, Tehran, Iran
来源
JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS | 2008年 / 345卷 / 05期
基金
美国国家科学基金会;
关键词
no-wait flow shop scheduling; multi-objective linear programming; fuzzy multi-objective linear programming; decision maker;
D O I
10.1016/j.jfranklin.2007.12.003
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This study develops a fuzzy multi-objective linear programming (FMOLP) model for solving the multi-objective no-wait flow shop scheduling problem in a fuzzy environment. The proposed model attempts to simultaneously minimize the weighted mean completion time and the weighted mean earliness. A numerical example demonstrates the feasibility of applying the proposed model to no-wait flow shop scheduling problem. The proposed model yields a compromised solution and the decision maker's overall levels of satisfaction. (C) 2008 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:452 / 467
页数:16
相关论文
共 23 条
[1]  
BELLMAN RE, 1970, MANAGE SCI B-APPL, V17, pB141
[2]   A comparison of solution procedures for two-machine flow shop scheduling with late work criterion [J].
Blazewicz, J ;
Pesch, E ;
Sterna, M ;
Werner, F .
COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 49 (04) :611-624
[3]   Minimizing the weighted number of tardy jobs on a two-machine flow shop [J].
Bulfin, RL ;
M'Hallah, R .
COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (12) :1887-1900
[4]   Minimizing maximum completion time in a proportionate flow shop with one machine of different speed [J].
Choi, Byung-Cheon ;
Yoon, Suk-Hun ;
Chung, Sung-Jin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (02) :964-974
[5]   A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size [J].
Danneberg, D ;
Tautenhahn, T ;
Werner, F .
MATHEMATICAL AND COMPUTER MODELLING, 1999, 29 (09) :101-126
[6]   Some local search algorithms for no-wait flow-shop problem with makespan criterion [J].
Grabowski, J ;
Pempera, J .
COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (08) :2197-2212
[7]   LINEAR-PROGRAMMING WITH MULTIPLE FUZZY GOALS [J].
HANNAN, EL .
FUZZY SETS AND SYSTEMS, 1981, 6 (03) :235-248
[8]  
ISHIBUCHI H, 2000, SCHEDULING FUZZINESS
[9]   ON FINDING COMPROMISE SOLUTIONS IN MULTICRITERIA PROBLEMS USING THE FUZZY MIN-OPERATOR [J].
LEBERLING, H .
FUZZY SETS AND SYSTEMS, 1981, 6 (02) :105-118
[10]   Solving multi-objective production scheduling problems using metaheuristics [J].
Loukil, T ;
Teghem, J ;
Tuyttens, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) :42-61