[3] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
[4] Univ Tehran, Dept Ind Engn, Fac Engn, Tehran, Iran
[5] Sharif Univ Technol, Dept Math Sci, Tehran, Iran
来源:
JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS
|
2008年
/
345卷
/
05期
基金:
美国国家科学基金会;
关键词:
no-wait flow shop scheduling;
multi-objective linear programming;
fuzzy multi-objective linear programming;
decision maker;
D O I:
10.1016/j.jfranklin.2007.12.003
中图分类号:
TP [自动化技术、计算机技术];
学科分类号:
0812 ;
摘要:
This study develops a fuzzy multi-objective linear programming (FMOLP) model for solving the multi-objective no-wait flow shop scheduling problem in a fuzzy environment. The proposed model attempts to simultaneously minimize the weighted mean completion time and the weighted mean earliness. A numerical example demonstrates the feasibility of applying the proposed model to no-wait flow shop scheduling problem. The proposed model yields a compromised solution and the decision maker's overall levels of satisfaction. (C) 2008 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.