No-wait flow shop scheduling using fuzzy multi-objective linear programming

被引:23
作者
Javadi, Babak [1 ]
Saidi-Mehrabad, M. [2 ]
Haji, Alireza [3 ]
Mahdavi, Iraj [1 ]
Jolai, F. [4 ]
Mahdavi-Amiri, N. [5 ]
机构
[1] Mazandaran Univ Sci & Technol, Dept Ind Engn, Babol Sar, Iran
[2] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[3] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
[4] Univ Tehran, Dept Ind Engn, Fac Engn, Tehran, Iran
[5] Sharif Univ Technol, Dept Math Sci, Tehran, Iran
来源
JOURNAL OF THE FRANKLIN INSTITUTE-ENGINEERING AND APPLIED MATHEMATICS | 2008年 / 345卷 / 05期
基金
美国国家科学基金会;
关键词
no-wait flow shop scheduling; multi-objective linear programming; fuzzy multi-objective linear programming; decision maker;
D O I
10.1016/j.jfranklin.2007.12.003
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This study develops a fuzzy multi-objective linear programming (FMOLP) model for solving the multi-objective no-wait flow shop scheduling problem in a fuzzy environment. The proposed model attempts to simultaneously minimize the weighted mean completion time and the weighted mean earliness. A numerical example demonstrates the feasibility of applying the proposed model to no-wait flow shop scheduling problem. The proposed model yields a compromised solution and the decision maker's overall levels of satisfaction. (C) 2008 The Franklin Institute. Published by Elsevier Ltd. All rights reserved.
引用
收藏
页码:452 / 467
页数:16
相关论文
共 23 条
[21]   Minimizing total completion time in a two-machine flow shop with deteriorating jobs [J].
Wang, Ji-Bo ;
Ng, C. T. Daniel ;
Cheng, T. C. E. ;
Liu, Li-Li .
APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) :185-193
[22]  
Zimmermann H.-J., 1978, Fuzzy Sets and Systems, V1, P45, DOI 10.1016/0165-0114(78)90031-3
[23]   DESCRIPTION AND OPTIMIZATION OF FUZZY SYSTEMS [J].
ZIMMERMANN, HJ .
INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 1976, 2 (04) :209-215