共 11 条
- [1] [Anonymous], QUALITY FUNCTION DEV
- [3] Hara T, 2004, 8TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL II, PROCEEDINGS, P374
- [4] KRASNER GE, 1988, J OBJECT-ORIENT PROG, V1, P41
- [5] A new method to cope with decision makers' uncertainty in the equipment selection process [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2004, 53 (01): : 389 - 392
- [7] Saaty TL., 1980, The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation
- [8] Sakao T, 2003, 2003 3RD INTERNATIONAL SYMPOSIUM ON ENVIRONMENTALLY CONSCIOUS DESIGN AND INVERSE MANUFACTURING - ECODESIGN '03, P567
- [9] TAKEDA H, 2003, P 14 INT C ENG DES I
- [10] Tomiyama T, 2001, SECOND INTERNATIONAL SYMPOSIUM ON ENVIRONMENTALLY CONSCIOUS DESIGN AND INVERSE MANUFACTURING, PROCEEDINGS, P613, DOI 10.1109/ECODIM.2001.992433