Cost assessment of efficiency losses in hydroelectric plants

被引:7
作者
Galvis, J. C. [1 ]
Padilha-Feltrin, A. [1 ]
Yusta Loyo, J. M. [2 ]
机构
[1] UNESP State Univ Sao Paulo, Dept Elect Engn, BR-15385000 Ilha Solteira, SP, Brazil
[2] UNIZAR Univ Zaragoza, Dept Elect Engn, Zaragoza 50018, Spain
关键词
Ancillary services; Efficiency losses; Hydroelectric generators; Operating reserve; ANCILLARY SERVICES; FREQUENCY; ENERGY;
D O I
10.1016/j.epsr.2011.05.006
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
080906 [电磁信息功能材料与结构]; 082806 [农业信息与电气工程];
摘要
Some important real-time tasks of the independent system operator (ISO) are the monitoring and control of power system events (load deviations and contingencies). These events are usually managed by the ISO using operating reserve ancillary services. These services represent an additional capacity (MW) available in generators and some interruptible loads. Generators must change their operating points in order that this capacity can remain available. These changes might lead to efficiency losses in energy production. In systems with a high percentage of hydroelectric production, hydroelectric plants need to know the impact of ancillary services on their profits. This work therefore analyzes the cost of efficiency losses due to operating reserve availability in hydroelectric generators. A method to calculate this cost component is proposed using a unit commitment dispatch for a single hydroelectric plant. This dispatch is performed without considering the operating reserve availability and is compared with the traditional dispatch, which takes into account the availability of operating reserve. The proposal is used to calculate the cost of efficiency losses on a Brazilian hydroelectric generator. We found that the cost of efficiency losses can be considerable when compared to the incomes of a hydroelectric plant in the short-term market. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:1866 / 1873
页数:8
相关论文
共 20 条
[1]
*ANEEL, 2007, TAR US CALC FIN COMP
[2]
[Anonymous], 2004, LOAD FREQ CONTR PERF
[3]
[Anonymous], 1994, RELIABILITY EVALUATI
[4]
Energy and reserve pricing in security and network-constrained electricity markets [J].
Arroyo, JM ;
Galiana, FD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (02) :634-643
[5]
*CCEE, 2007, COMM SETTL RUL MOD 1
[6]
*CCEE, 2007, COMM SETTL RUL MOD 4
[7]
*CEPEL, 2008, COMP PROGR
[8]
Energy and ancillary service dispatch through dynamic optimal power flow [J].
Costa, A. L. ;
Costa, A. Simoes .
ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (08) :1047-1055
[9]
ENCINA ASA, 2008, INT J EMERG ELECT PO, V9, P1
[10]
Unit commitment of single hydroelectric plant [J].
Finardi, EC ;
da Silva, EL .
ELECTRIC POWER SYSTEMS RESEARCH, 2005, 75 (2-3) :116-123