A solution approach to the disassembly line balancing problem in the presence of task failures

被引:210
作者
Güngör, A
Gupta, SM
机构
[1] Northeastern Univ, Dept Mech Ind & Mfg Engn, Snell Engn Ctr 334, Lab Responsible Mfg, Boston, MA 02115 USA
[2] Pamukkale Univ, Coll Engn, Dept Ind Engn, TR-20017 Denizli, Turkey
关键词
D O I
10.1080/00207540110052157
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we discuss the disassembly line balancing problem in the presence of task failures (DLBP-F). There are precedence relationships among disassembly tasks and the tasks must be completed within a given time, determined by the demand in a given period. However, if a task (or more than one task) cannot be performed because of some defect, some or all of the remaining tasks may be disabled due to the precedence relationships among tasks. This may result in various complications in the flow of workpieces on the disassembly line, e.g. early-leaving, self-skipping, skipping, disappearing and revisiting workpieces. We discuss these complications and highlight their effects on the disassembly line. The problem is to assign tasks to workstations such that the effect of the defective parts on the disassembly line is minimized. This paper presents a solution procedure to the DLBP-F. An example is provided to illustrate the approach.
引用
收藏
页码:1427 / 1467
页数:41
相关论文
共 44 条
[1]  
ANSEMS AMM, 1994, P IEEE INT S EL ENV
[2]  
Askiner Gungor, 1998, P 1998 NE DECISION S, P250
[3]   OPERATIONS PLANNING ISSUES IN AN ASSEMBLY DISASSEMBLY ENVIRONMENT [J].
BRENNAN, L ;
GUPTA, SM ;
TALEB, KN .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1994, 14 (09) :57-67
[4]   DISASSEMBLY AND RECYCLING OF ELECTRONIC CONSUMER PRODUCTS - AN OVERVIEW [J].
DERON, A ;
PENEV, K .
TECHNOVATION, 1995, 15 (06) :363-374
[5]   Shortest-route formulation of mixed-model assembly line balancing problem [J].
Erel, E ;
Gokcen, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 116 (01) :194-204
[6]   A COMPREHENSIVE LITERATURE-REVIEW AND ANALYSIS OF THE DESIGN, BALANCING AND SCHEDULING OF ASSEMBLY SYSTEMS [J].
GHOSH, S ;
GAGNON, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (04) :637-670
[7]   Issues in environmentally conscious manufacturing and product recovery: a survey [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1999, 36 (04) :811-853
[8]   An evaluation methodology for disassembly processes [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (1-2) :329-332
[9]   Disassembly sequence planning for products with defective parts in product recovery [J].
Gungor, A ;
Gupta, SM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1998, 35 (1-2) :161-164
[10]   Disassembly of products [J].
Gupta, SM ;
McLean, CR .
COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 31 (1-2) :225-228